[The Opening of the New Brick Highway - 1936]

Description:

A new, brick-topped highway was opened between Mineral Wells and Weatherford in 1936. In the opening ceremony, J. Pat Corrigan is identified cutting the symbolic ribbon held by Allan Wallace and W.A. Ross. The new brick highway began at [NE?] 9th Avenue, and extended along East Hubbard Street. Brick paving the 21-mile stretch of road was laid entirely by hand by two black men whose names, however, were never preserved for posterity.

Creator(s): Unknown
Location(s): United States - Texas - Palo Pinto County - Mineral Wells
Creation Date: Unknown
Partner(s):
Boyce Ditto Public Library
Collection(s):
A. F. Weaver Collection
Usage:
Total Uses: 128
Past 30 days: 0
Yesterday: 0
Creator:
Unknown
Date(s):
  • Digitized: October 23, 2006
Coverage:
Place
United States - Texas - Palo Pinto County - Mineral Wells
Era
New South, Populism, Progressivism, and the Great Depression, 1877-1939
Date
1936  
Description:

A new, brick-topped highway was opened between Mineral Wells and Weatherford in 1936. In the opening ceremony, J. Pat Corrigan is identified cutting the symbolic ribbon held by Allan Wallace and W.A. Ross. The new brick highway began at [NE?] 9th Avenue, and extended along East Hubbard Street. Brick paving the 21-mile stretch of road was laid entirely by hand by two black men whose names, however, were never preserved for posterity.

Language(s):
Subject(s):
Partner:
Boyce Ditto Public Library
Collection:
A. F. Weaver Collection
Identifier:
  • LOCAL-CONT-NO: AWO_1051P
  • ARK: ark:/67531/metapth25095
Resource Type: Photograph
Format: Image
Rights:
Access: Public