You limited your search to:

 Collection: Dallas Water Utilities Records, 1882-1990 - Photographic Materials Series
General Headquarters & Mess Hall, Transient Camp at Lake Dallas

General Headquarters & Mess Hall, Transient Camp at Lake Dallas

Date: 1930s
Creator: City of Dallas
Description: General Headquarters & Mess Hall, Transient Camp at Lake Dallas
Contributing Partner: Dallas Municipal Archives
Handkercheif held at point which reached water at 7:30 am Saturday morning May 18, 1935. Underpass under Santa Fe on the Denton/ponder highway.

Handkercheif held at point which reached water at 7:30 am Saturday morning May 18, 1935. Underpass under Santa Fe on the Denton/ponder highway.

Date: 5/24/1935
Creator: City of Dallas
Description: Handkercheif held at point which reached water at 7:30 am Saturday morning May 18, 1935. Underpass under Santa Fe on the Denton/ponder highway.
Contributing Partner: Dallas Municipal Archives
[Image of Flooded Areas]

[Image of Flooded Areas]

Date: May 5, 1935
Creator: unknown
Description: Photograph of a large body of water. Near the center of the photograph, there is a partially-submerged post-and-wire fence and trees running the length of the image. Trees are visible in the background and a patch of grass is visible in the foreground, at the edge of the water. Text on the back of the photograph says: "May 5 - 1935 2:15 PM. Taken from same point as No. 17 but looking North West."
Contributing Partner: Dallas Municipal Archives
Inlet side of Bachman Lake bypass after removal of debris. Gates closed

Inlet side of Bachman Lake bypass after removal of debris. Gates closed

Date: unknown
Creator: City of Dallas
Description: Inlet side of Bachman By-pass after removal of debris. Gates closed
Contributing Partner: Dallas Municipal Archives
Inlet side of Bachman Lake bypass gates, both gates open 30", before removal of debris.

Inlet side of Bachman Lake bypass gates, both gates open 30", before removal of debris.

Date: 5-20-1974
Creator: City of Dallas
Description: Inlet side of Bachman Bypass gates, both gates open 30", before removal of debris.
Contributing Partner: Dallas Municipal Archives
Inlet side of Bachman Lake bypass gates. Both gates open 30", before removal of debris.

Inlet side of Bachman Lake bypass gates. Both gates open 30", before removal of debris.

Date: 19uu-05-30
Creator: City of Dallas
Description: Inlet side of Bachman by-pass gates. Both gates open 30", before removal of debris.
Contributing Partner: Dallas Municipal Archives
[Installation of New Water Main]

[Installation of New Water Main]

Date: November 17, 1952
Creator: unknown
Description: Photograph of workers installing new water main at White Rock filter station. City of Dallas stamp and handwritten note on reverse: "New 30" main installed between settling basin & pump stn at old White Rock filter plant 11/17/52."
Contributing Partner: Dallas Municipal Archives
[Installation of New Water Main]

[Installation of New Water Main]

Date: unknown
Creator: unknown
Description: Photograph of workers installing a new water main. On reverse are four additional photographs. Clockwise from top left: Workers in a field with insert picture of unidentified man; construction of a building; water tank with buildings in background; workers installing a water main. Handwritten note at top: "Proctor Gamble."
Contributing Partner: Dallas Municipal Archives
Intake well excavation in foreground.

Intake well excavation in foreground.

Date: unidentified
Creator: City of Dallas
Description: Intake well excavation in foreground
Contributing Partner: Dallas Municipal Archives
[Lewisville Lake Dam Control Station]

[Lewisville Lake Dam Control Station]

Date: unknown
Creator: unknown
Description: Photograph of a Lewisville Lake control station.
Contributing Partner: Dallas Municipal Archives