8 Matching Results

Search Results

[Downtown Water Tower]

Description: Photograph of a water tower in downtown Port Arthur. In the foreground, there are cars on streets, and parked cars in parking lots. In the background, there are buildings; the building directly behind the water tower is identified as the city garage. The water tower was building in 1938 and holds 300,000 gallons.
Date: 1970~
Partner: Port Arthur Public Library

[Construction of Water Tower]

Description: Photograph of the construction of a one million gallon water tower in Pioneer Park. Half of the tank of the tower has not been built. There are men and construction equipment in the tank. In the background, there are buildings; a four story tall building is identified as Saint Mary Hospital.
Date: 1951
Partner: Port Arthur Public Library

[Concrete Water Tower]

Description: Photograph of an aerial view of a concrete water tower on Fourth Street and Dallas Avenue. A parking lot is in front of the tower, and buildings surround it from other directions. Text at the top-left of the photograph says "City of Port Arthur Concrete water tower, built 1938. At 4th and Dallas. 300,000 Gallon[,] Photo: 11/74."
Date: November 13, 1974
Partner: Port Arthur Public Library

[Aerial View of Water Tower]

Description: Photograph of an aerial view of a 500,000 gallon water tower on Railroad Avenue. Behind the water tower, there is a train and an industrial storage lot. Text on the top-right of the photograph says "City of Port Arthur Water tower on Railroad Avenue and W. Thomas Blvd. Built 195. Capacity - 500,000 gallons. Photo - 11/13/74."
Date: November 13, 1974
Partner: Port Arthur Public Library

[Aerial View of Water Tower]

Description: Photograph of an aerial view of a 300,000 gallon water tower. Trees surround the tower, and a baseball field is located behind it. Text at the bottom-left of the photograph says "City of Port Arthur Gilham Circle Water Tower. Built - 1920. Capacity - 300,000 Photo - 11/13/74."
Date: November 13, 1974
Partner: Port Arthur Public Library

[Water and Sewer Planning Session]

Description: Photograph of five men at a planning session for a Port Arthur water and sewer bond issue. Pictured standing left to right are Paul Rushing, Assistant City Engineer; City Councilmen Bernis W. Sadler and Larry Fontana; and Robert A. Bowers, Director of Public Works. Seated in a wheelchair is H. P. Rodrique, Head Draftsman. They are standing around a drawing table looking at a set of blueprints.
Date: unknown
Partner: Port Arthur Public Library
Back to Top of Screen