14 Matching Results

Search Results

[Berry Creek Bridge on U.S. Highway 81]

Description: Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows forms after placing concrete pier number 2, Berry Creek bridge.
Date: July 18, 1939
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Berry Creek Bridge on U.S. Highway 81]

Description: Photograph of damage to Berry Creek Bridge on U.S. Highway 81 showing crumpling of truss. Detail of damage shows partial view of the dedication plaque beginning: J.D. Fauntleroy, State Highway Engineer.
Date: 1959
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Photograph of Berry Creek Bridge #2]

Description: Photograph of Berry Creek Bridge. In the foreground there is a sign that reads "narrow bridge". On either side of the bridge is a wooded landscape area. Text on the back reads "Looking south on U.S. Hwy 81 at Berry Creek Bridge Williamson Co.".
Date: unknown
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Photograph of Berry Creek Bridge]

Description: Photograph of the road leading in to Berry Creek Bridge. In the background of the bridge there is a treelike landscape. In the foreground to the right there are construction signs "slow" and "narrow bridge". On the back there is text that reads "Looking north on U.S. Hwy 81 at Berry Creek Bridge Williamson Co.".
Date: unknown
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Berry Creek Bridge Flood Damage]

Description: Photograph of the east frontage road of Interstate 35 at Berry Creek, looking west. Erosion is visible in the base and pavement at north end of Berry Creek low-water structure. Date of flood: May 16, 1959
Date: May 19, 1965
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Berry Creek Bridge Flood Damage]

Description: East frontage road Interstate 35, Berry Creek. Looking east showing erosion at north end of Berry Creek Low Water Structure. Date of Flood: May 16, 1965. Two men are standing on damaged area.
Date: May 19, 1965
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation
Back to Top of Screen