1,544 Matching Results

Search Results

Texas Mobility Fund Financial Statements: 2011

Description: Annual statements documenting finances of the Texas Mobility Fund, with an independent auditor's report. It includes statements and comparative information for fiscal years 2009 through 2011.
Date: Autumn 2011
Creator: Finance Division of the Texas Department of Transportation
Partner: UNT Libraries Government Documents Department

Prefabricated Bridge Innovations

Description: "This paper describes advantages and recent innovations in the use of prefabricated bridge elements and systems, highlighting uses throughout the country." (p. 1).
Date: [2001..2004]
Creator: Freeby, Gregg; Medlock, Ronald & Slagle, Sharon
Partner: UNT Libraries Government Documents Department

Agricultural Landscape Development Along US 277

Description: The project area includes parts of seven counties in the North-Central Plains region of Texas--Wichita, Archer, Baylor, Knox, Jaskell, Jones, and Taylor--and stretches along approximately 150 miles of U.S. Highway 277.
Date: May 2003
Creator: Freeman, Martha Doty
Partner: UNT Libraries Government Documents Department

Mobility 2025: Metropolitan Transportation Plan

Description: Report on San Antonio-Bexar County's Metropolitan Transit Plan. The plan addresses improving roadway capacity, maintaining existing roadways, improving public transportation services, and other transportation improvements such as bicycle and pedestrian improvements.
Date: December 1999
Creator: San Antonio Metropolitan Planning Organization
Partner: UNT Libraries Government Documents Department

Transvision 2015: San Antonio-Bexar County MPO Long Range Transportation Plan - 1994

Description: The Long Range Transportation Plan is the basic framework for the San Antonio - Bexar County Metropolitan Planning Organization's continuous, comprehensive, and coordinated regional transportation planning efforts for the next 20 years. It addresses the mobility needs of the Study Area to the year 2015 by identifying transportation improvement projects within the following categories: improving roadway capacity, maintenance of existing roadways, improving public transit services, and other tran… more
Date: December 1994
Creator: San Antonio Metropolitan Planning Organization
Partner: UNT Libraries Government Documents Department

2010 Summer Transportation Institute

Description: Poster advertising the 2010 Summer Transportation Institute Program. There are two women pictured with a man standing behind them on a background of a starry night sky.
Date: 2010
Creator: Texas. Department of Transportation.
Partner: UNT Libraries Government Documents Department

Annual Reports to the Legislature on Certain Matters: 2004

Description: Annual report detailing expenditures by the Texas Department of Transportation during 2004, including the unified transportation program (UTP), turnpike and toll road projects, and some rail facilities, as well as the amount of bonds, public securities, and other funds used for transportation projects.
Date: December 1, 2004
Creator: Texas. Department of Transportation.
Partner: UNT Libraries Government Documents Department

Austin to Houston Passenger Rail Study

Description: The purpose of the Austin to Houston Passenger Rail Study is to analyze the feasibility of implementing 110 mph intercity passenger rail service between Austin and Houston including possible service to Bryan/ College Station. This feasibility analysis consisted of identifying the characteristics of existing rail infrastructure and operations in the study corridors, analyzing potential alternative alignments for the passenger rail operations, and determining required infrastructure and impacts f… more
Date: December 2011
Creator: Texas. Department of Transportation.
Partner: UNT Libraries Government Documents Department

[Berry Creek Bridge Flood Damage]

Description: Photograph of the east frontage road of Interstate 35 at Berry Creek, looking west. Erosion is visible in the base and pavement at north end of Berry Creek low-water structure. Date of flood: May 16, 1959
Date: May 19, 1965
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Berry Creek Bridge Flood Damage]

Description: East frontage road Interstate 35, Berry Creek. Looking east showing erosion at north end of Berry Creek Low Water Structure. Date of Flood: May 16, 1965. Two men are standing on damaged area.
Date: May 19, 1965
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Berry Creek Bridge on U.S. Highway 81]

Description: Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows forms after placing concrete pier number 2, Berry Creek bridge.
Date: July 18, 1939
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation

[Berry Creek Bridge on U.S. Highway 81]

Description: Photograph of damage to Berry Creek Bridge on U.S. Highway 81 showing crumpling of truss. Detail of damage shows partial view of the dedication plaque beginning: J.D. Fauntleroy, State Highway Engineer.
Date: 1959
Creator: Texas. Department of Transportation.
Partner: Texas Department of Transportation
Back to Top of Screen