116 Matching Results

Search Results

[Coldwell School Rendering]

Description: Rendering of the front of the Coldwell School in El Paso, Texas. There are windows along its length, with a main entrance in the middle. The ground is slanting up and to the right.
Date: 1930~
Creator: Aultman, Otis A., 1874-1943
Partner: El Paso Public Library

[American Legion Rendering]

Description: Rendering of a rear addition to the American Legion Post 36 Building located at N. Santa Fe Street and W. Missouri Avenue in El Paso, Texas. The building has four tall archway windows to the right, columns on a slightly elevated balcony in the center, and landscaping with trees to the left near a flag.
Date: 1930~/1939~
Creator: Aultman, Otis A., 1874-1943
Partner: El Paso Public Library

Mullin High School, Mullin, Texas: Plans, Elevations, and Details

Description: Plans, elevations, and details for a high school building in Mullin, Texas. It includes typical wall section, details of doors, detail of classroom windows, detail of raised panels, detail of blackboards in classroom, foundation plan, floor plan, roof plan, rear elevation, end elevation, room finish schedule, window schedule, and door schedule.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Grade School Building, Haskell, Texas: Floor Plan

Description: Floor plan for a grade school building in Haskell, Texas. It includes a detailed floor plan, window schedule, door and transom schedule, locker room plan, room and finish schedule, and partial floor plan showing classrooms replacing stage 4 part of auditorium as called for under alternate "C."
Date: 1936~
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Consolidated Community School Building Monahans, Texas: Miscellaneous Details

Description: Miscellaneous details for a consolidated community school building for Ward County district 2 in Monahans, Texas. It includes scale details of locker room and auditorium windows, section through rear wall of gym, section through study hall counter and partition, scale section through front of stage and footlights, detail of bookshelves in library, typical classroom wall and window section, and window and door details.
Date: 1936
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Grade School Building, Haskell, Texas: Gymnasium Details

Description: Gymnasium details for a grade school building in Haskell, Texas. It includes section through building, part sectional elevation of gym looking toward stage, section through window in gymnasium, scale detail of stage front showing access/doors, detail section of monitor windows and wall, section through outside bleacher wall, and elevation and section of bulletin board.
Date: 1936~
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Mullin High School, Mullin, Texas: Miscellaneous Details

Description: Miscellaneous details for a high school building in Mullin, Texas. It includes floor plan, foundation plan, left side elevation, right side elevation, end elevation, cross section through gymnasium-auditorium, detail of roof framing, sections looking at bleachers and stage, finish schedule, door schedule, steel sash schedule, and window schedule.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Building Addition, Merkel, Texas: Floor Plans and Schedules

Description: Floor plans and schedules for an addition to a high school building in Merkel, Texas. It includes first floor, second floor, and foundation plans, plan showing new work in girl's toilet, and miscellaneous sections, as well as lintel beam, door, window, footing, and grade beam schedules.
Date: 1935
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Gymnasium, Noodle, Texas: Elevations, Sections, and Floor Plan

Description: Elevations, sections, and floor plan for a high school gymnasium in Noodle, Texas. It includes elevations of the front, rear, and side exteriors of the building, as well as a floor plan, foundation plan, detail of roof framing, cross section and longitudinal section through gymnasium, finish schedule, door schedule, steel sash schedule, and wood window schedule.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen