Abilene Library Consortium - Browse

ABOUT BROWSE FEED

Abilene State Hospital Dormitory, Abilene, Texas: Roof Framing Plan

Description: Framing plan for a two-story dormitory building at Abilene State Hospital in Abilene, Texas. This plan contains a drawing of the roof framing design with a schedule for the joists and beams. The drawings in the top right corner detail the building's staircases.
Date: July 5, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Abilene State Hospital Dormitory, Abilene, Texas: Second Floor Layout

Description: Second story floor plan for a two-story dormitory building at Abilene State Hospital in Abilene, Texas. This plan shows the layout of the level with labels denoting where each room is located. Also included is a room finish schedule created at the top of the sheet.
Date: July 5, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Abilene State Hospital Employee Dormitory, Abilene, Texas: First Floor Layout

Description: Architectural plan for an occupational therapy and employee dormitory building at Abilene State Hospital in Abilene, Texas. It includes a drawing of the floor plan for the building's first floor, as well as a room and finish schedule; the window schedule is drawn just above the floor plan.
Date: November 9, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Abilene State Hospital Employee Dormitory, Abilene, Texas: First Floor Framework

Description: Framing plan for an occupational therapy and employee dormitory building at Abilene State Hospital in Abilene, Texas. It includes a drawing of the framing plan to be used for the building's first floor, as well as a column and footing schedule.
Date: November 9, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Abilene State Hospital Employee Dormitory, Abilene, Texas: Front Elevation

Description: Architectural plan for an occupational therapy and employee dormitory building at Abilene State Hospital in Abilene, Texas. It includes a large drawing of half of the front elevation along with a section looking through the front wall of the building.
Date: November 9, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Taylor County Jail, Abilene, Texas: Second Floor Layout and Details

Description: Floor plan for the second floor of the Taylor County Jail in Abilene, Texas. It includes a large drawing of the layout of the second floor with labels for each room, hallway, and doorway. Also included are smaller drawings that detail various sections of the framework, and a finish schedule.
Date: January 1, 1931
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Taylor County Jail, Abilene, Texas: First Floor Layout and Details

Description: Floor plan for the first floor of the Taylor County Jail in Abilene, Texas. It includes a large drawing of the layout of the floor with all of the rooms, doorways, and hallways labeled accordingly. Also included are schedules for the windows, rooms, and jail doors, as well as a number of smaller drawings showing details of the outside kitchen door frame.
Date: January 1, 1931
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Taylor County Jail, Abilene, Texas: Third and Fourth Floor Framework

Description: Framing plans for the third and fourth floors of the Taylor County Jail in Abilene, Texas. It includes drawings of the framing plans for the third and fourth floors which include measurements and specifications for the beams that make up the framework. There is a lengthy note written at the top of the sheet along with a schedule for the beams on these floors.
Date: January 1, 1931
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Taylor County Jail, Abilene, Texas: Second Floor Mechanical Plan

Description: Mechanical plan for the Taylor County Jail in Abilene, Texas. It includes a floor plan for the second floor with notations detailing the plumbing and electrical work throughout the building. Also included is a plumbing riser diagram which shows how the systems runs from each floor.
Date: January 1, 1931
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Taylor County Jail, Abilene, Texas: Second Floor Framing Plan

Description: Framing plan for the second floor of the Taylor County Jail in Abilene, Texas. It includes a drawing of the framework for the second floor with notations for measurements and specifications of the beams. Also included is a schedule for the beams that make up the framework.
Date: January 1, 1931
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Taylor County Jail, Abilene, Texas: East Elevation and Window Details

Description: Elevation plan for the East side of the Taylor County Jail in Abilene, Texas. It includes a drawing of the East side of the building with measurements detailing the elevation. Also included are drawings detailing the window guards, and the glass observation panel.
Date: January 1, 1931
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Hudson Residence, Pecos, Texas: Revised Electrical Work

Description: Revised electrical plan for a home commissioned by Mr. and Mrs. Hill Hudson in Pecos, Texas. It includes a floor plan of the home with notations concerning the electrical work; this plan contains highlight marks on parts of the walls. There is an electrical riser diagram drawn at the top of the sheet, as well as a list of symbols used in the plan.
Date: March 13, 1951
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Hudson Residence, Pecos, Texas: Revised Air Conditioning Plan

Description: Revised air conditioning plan for a home commissioned by Mr. and Mrs. Hill Hudson in Pecos, Texas. It includes a drawing of the home's floor plan including labels for each room and doorway; sections of the walls are highlighted in pink. The plan also contains notations concerning the building's air conditioning system.
Date: March 13, 1951
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.