Abilene Library Consortium - 18 Matching Results

Search Results

Stamford High School Addition, Stamford, Texas: Floor Plan & Elevation Details

Description: Floor plan and elevation details for Stamford High School in Stamford, Texas. The floor plan features wall edge lines, measurements, and labels. Other sections include half elevation looking toward counter, half elevation case "B" at magazine side, half elevation case "B" at book side, and other wall sections.
Date: August 1, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Stamford High School Addition, Stamford, Texas: Floor & Roof Framing Plans

Description: Floor and roof framing plans for Stamford High School in Stamford, Texas. They feature measurements, wall edge lines, labels, directional lines, and notes. Other sections include detail of concrete roof frame, detail cross section thru roof frame, section thru present roof over first floor, elevation of side of roof frame, and detail of column joints.
Date: August 1, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Stamford High School Addition, Stamford, Texas: Ground Floor Plan

Description: Ground floor plan for an addition to Stamford High School in Stamford, Texas. It features wall edge lines, measurements, labels, notes, red colored lines, and symbol legend. Other sections include a method of drifting ends of steam mains, and diagram of connections to diagram differential vacuum pump.
Date: August 1, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Stamford High School Addition, Stamford, Texas: Window, Door, & Elevation Details

Description: Window, door, and elevation details for Stamford High School in Stamford, Texas. Sections include rear elevation, side elevation, detail of blackboard, detail of locker setting, full size sanitary base in class rooms, typical D.M. window details, door #1 with transom, detail of doors between corridor and class rooms, detail of compo base, full size picture mold, and full size wainscot in corridors.
Date: August 1, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Stamford High School Alterations, Stamford, Texas: First Floor Plan & Louver Detail

Description: Revised first floor plan and louver detail for alterations to Stamford High School in Stamford, Texas. The floor plan features room names, labels, and wall edge lines with sections that are colored red. The louver detail features measurements, texture lines, orange shading, labels, and notes. A window schedule is included above the louver detail, and a legend is included beneath the louver detail.
Date: July 20, 1920
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Stamford High School Alterations, Stamford, Texas: Toilet Plans

Description: Toilet plans for alterations to Stamford High School in Stamford, Texas. Sections include floor plan of boys toilet in basement, detail showing toilet room floor, boy's toilet for first floor, boy's toilet for second floor, girl's toilet in basement, girl's toilet for first floor, girl's toilet for second floor, section thru shower bath, and elevation toilet stalls. They feature orange colored walls, measurements, and labels.
Date: July 20, 1920
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen