Are We There Yet? Transportation in Central Texas - 113 Matching Results

Search Results

[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B(1) U.S. Highway 79 in Taylor. Includes cars, utility poles, businesses and some barricades in the distance.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with homes, sidewalks, utility poles, and Marathon Oil Company gas station.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Detail of sidewalk at corner with steps and retaining wall with a home in the background.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with new Missouri-Kansas-Texas Railroad underpass, homes, sidewalks, and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with new Missouri-Kansas-Texas Railroad underpass, ladder, sidewalks, and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. View of new Missouri-Kansas-Texas Railroad underpass showing rails, railings and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Shows culvert and riprap alongside new Missouri-Kansas-Texas Railroad underpass. A bicycle is in the background.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene just past the cemetery entrance shows manicured shrubs along cemetery edge, homes and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with the cemetery entrance on the left, homes and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene looking back to town past the cemetery entrance shows homes, Missouri-Kansas-Texas Railroad underpass and church spires in the distance. Possibly paving the highway near the underpass. Man in hat and necktie walking beside the highway.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. New bridge across creek that runs into Mustang Creek. Shown are railings, riprap and homes in the distance.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Side view of new bridge across creek that runs into Mustang Creek. Shown are railings, riprap and piers.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Underside view of new bridge across a creek that runs into Mustang Creek. Shown are railings, riprap and piers.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Shows cemetery and culverts at entrance.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with new Missouri-Kansas-Texas Railroad underpass and sidewalks.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with new Missouri-Kansas-Texas Railroad underpass and sidewalks. Visible train including Missouri-Pacific boxcar, Green Bay & Western boxcar and MKT gondola.
[Photograph of Asphalt Surface Treatment]
Photograph of a construction vehicle rolling along a stretch of asphalt road. On either side of the road are open fields of land. Text on back reads "Asphalt Surface Treatment north from Sta 811f00 Compacting with pneumatic tire roller".
[Photograph of Asphalt Surface Treatment #2]
Photograph of an asphalt section of road after receiving an asphalt surface treatment. Text on back reads. "Asphalt surface treatment north from Sta 826".
[Photograph of Asphalt Surface Treatment #3]
Photograph of a distribution vehicle applying an asphalt surface treatment.
[Photograph of Construction Vehicle Applying Surface Treatment]
Photograph of a construction vehicle applying an asphalt surface treatment. There is one worker standing off to the left side of the treatment. Text on the back reads "Asphalt surface treatment north from Sta 864".
[Photograph of Distributor Vehicle]
Photograph of a construction worker on the distributor vehicle. This vehicle is distributing the asphalt surface treatment that is a dark color.
[Photograph of Detour Sign and Barricades]
Photograph of a detour sign with barricades visible in the background. The road is positioned next to an open empty field to the right. Text on the back reads "View of barricades from Sta. 846 - detouring traffic".
[Photograph of Dry Creek Berry Bridge]
Photograph of Dry Berry Creek Bridge. Under the bridge is the dry ground where one man is visible walking by the 3rd support column from the left.
[Photograph of Construction Barricades]
Photograph of construction barricades. There is one man in uniform standing in front of the barricades and one dark color vehicle parked behind the barricades.
[Photograph of Road Sign]
Photograph of a road sign that reads "Begin Detour 500 ft". On either side of the road are open fields of land and cars are visible traveling along the road in the distance. Text on the back reads "Barricades from Sta 875 - Detouring Traffic".
[Photograph of Unknown Road #28]
Photograph of an unknown road. There are small fences set up to on the right side of the road and to the left. Text on the back reads "Barricades Sta 846 - Detouring Traffic".
[Photograph of Construction on U.S. Hwy 81]
Photograph of construction on U.S. Hwy 81 in Williamson County, Texas. In the background there is a "keep to right" sign and construction equipment. Handwritten text on back reads "US Hwy 81, Williamson County, approaching new construction at north end of project. Traffic routed over new highway for completion of flexible base. Keep to right sign used for safety of traffic. 10-10-39".
[Photograph of Rock Mounds]
Photograph of mounds of rocks from construction. Behind the mounds tree lines are visible as well as open areas of land. Handwritten text on back reads "US Hwy 81, Williamson County, Flexible base material on highway before spreading, 10-9-1939".
[Photograph of a Flexible Base Plant]
Photograph of a construction plant with mounds of dirt in the background. There is text on the back that reads "Flexible Base Plant in operation".
[Photograph of Construction Truck Near Quarry]
Photograph of a construction truck and crane on a quarry. Text on the back reads "Loading flexible base material from Quarry for processing by plant".
[Photograph of Quarry Area]
Photograph of construction equipment in a construction area. Text on the back reads "view of Flexible Base Plant and quarry in background"
[Photograph of Construction Steel]
Photograph of construction steel being placed. Text on back reads "view of dock steel in place, Dry Berry Creek Bridge".
[Photograph of Deck Steel]
Photograph of steel beams in a construction site. Handwritten text on back reads "FAP140-C (3) US Hwy 81 Williamson County. Curb forms and deck steel in place, span #3 Dry Berry Creek Bridge - 8-30-39".
[Photograph of Construction of Second Pier]
Photograph of the construction of the second pier on the San Gabriel River. The large concrete structure is in a vertical position with workers at the top. Around the structure is construction materials and rocky ground.
[Photograph of North San Gabriel River Bridge]
Photograph of the North San Gabriel River Bridge. In the background of the bridge is a wooded area and below the bridge is a river. To the right side under the bridge the ground is inclined to support the bridge.
[Photograph of North San Gabriel River Bridge #2]
Photograph of the San Gabriel River Bridge from the north viewpoint. Under the bridge tall grassy landscape is visible and a tree line in the background.
[Photograph of North San Gabriel River Bridge #3]
Photograph of the San Gabriel River Bridge.
[Photograph of North San Gabriel River Bridge #4]
Photograph of the San Gabriel River Bridge. In the foreground and background the rocky shorelines of the river are visible.
[Berry Creek Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows forms after placing concrete pier number 2, Berry Creek bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows placing forms for concrete bent number 2, North San Gabriel River bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows placing forms for concrete bent number 2, North San Gabriel River bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows excavation for footing of pier number 2, North San Gabriel River bridge. Lower half of a men win overalls and work gloves can be seen next to tubes.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows excavation for footing east let of pier number 2, North San Gabriel River bridge. Shovel, pick axe and bucket can be seen.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows placing concrete bent number 2, North San Gabriel River bridge. Men are working on scaffolding for the bent and there is a partial view of a shovel.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Demolition stage shows the old North San Gabriel River bridge removed and a shovel in the riverbed with the dome of Williamson County Courthouse in the distance.
[Photograph of Unknown Bridge]
Photograph of an unknown bridge and the supporting structure. In the background the bridge is connected to a rocky area with trees visible to the right side.
[South San Gabriel River Bridge on U.S. Highway 81]
Photograph of excavating for footing of Bent 2 center section, construction of South San Gabriel River bridge. This is Federal Aid Project 140-b (9) Job 15. On U.S. Highway 81 also known as Highway 2 (old designation.)
[South San Gabriel River Bridge on U.S. Highway 81]
Photograph of excavating for footing of Bent 2 center section, construction of South San Gabriel River bridge. This is Federal Aid Project 140-b (9) Job 15. On U.S. Highway 81 also known as Highway 2 (old designation.)
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Demolition stage shows preparing to move North truss from the old North San Gabriel River bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Demolition stage shows lowering truss of the old North San Gabriel River bridge.
Back to Top of Screen