Are We There Yet? Transportation in Central Texas - 113 Matching Results

Search Results

[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows placing forms for concrete bent number 2, North San Gabriel River bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows placing forms for concrete bent number 2, North San Gabriel River bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows excavation for footing of pier number 2, North San Gabriel River bridge. Lower half of a men win overalls and work gloves can be seen next to tubes.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows excavation for footing east let of pier number 2, North San Gabriel River bridge. Shovel, pick axe and bucket can be seen.
[Berry Creek Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Construction stage shows forms after placing concrete pier number 2, Berry Creek bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Demolition stage shows dismantling trusses, North San Gabriel River bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Demolition showing tower derrick set up to remove trusses and to set new structural steel, North San Gabriel River bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Demolition stage shows truss lowered to ground, old North San Gabriel River bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Demolition stage shows truss being lowered to the ground, old North San Gabriel River bridge.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16 on U.S. Highway 81 also known as Highway 2 (old designation). Demolition stage shows truss on the ground, old North San Gabriel River bridge.
[Roadside Park on U.S. Highway 81]
Photograph of roadside park on U.S. Highway 81 also known as Highway 2. Shows grove of trees shading picnic tables, low masonry walls and a parked car.
[Roadside Park on U.S. Highway 81]
Photograph of roadside park on U.S. Highway 81 also known as Highway 2. Shows grove of trees shading picnic tables, barbecue grill and a parked car.
[Roadside Park on U.S. Highway 81]
Photograph of roadside park on U.S. Highway 81 also known as Highway 2. Shows grove of trees shading picnic tables, barbecue grill and a parked car.
[North San Gabriel River Bridge on U.S. Highway 81]
Photograph of Federal Aid Project 260 (2) Job 16. Old North San Gabriel River bridge with guy derrick in place for removing trusses. Detour bridge is also visible in the background on U.S. Highway 81 also known as Highway 2 (old designation)
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B(1) U.S. Highway 79 in Taylor. Includes cars, utility poles, businesses and some barricades in the distance.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with homes, sidewalks, utility poles, and Marathon Oil Company gas station.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Detail of sidewalk at corner with steps and retaining wall with a home in the background.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with new Missouri-Kansas-Texas Railroad underpass, homes, sidewalks, and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with new Missouri-Kansas-Texas Railroad underpass, ladder, sidewalks, and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. View of new Missouri-Kansas-Texas Railroad underpass showing rails, railings and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Shows culvert and riprap alongside new Missouri-Kansas-Texas Railroad underpass. A bicycle is in the background.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene just past the cemetery entrance shows manicured shrubs along cemetery edge, homes and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with the cemetery entrance on the left, homes and utility poles.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene looking back to town past the cemetery entrance shows homes, Missouri-Kansas-Texas Railroad underpass and church spires in the distance. Possibly paving the highway near the underpass. Man in hat and necktie walking beside the highway.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. New bridge across creek that runs into Mustang Creek. Shown are railings, riprap and homes in the distance.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Side view of new bridge across creek that runs into Mustang Creek. Shown are railings, riprap and piers.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Underside view of new bridge across a creek that runs into Mustang Creek. Shown are railings, riprap and piers.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Shows cemetery and culverts at entrance.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with new Missouri-Kansas-Texas Railroad underpass and sidewalks.
[U.S. Highway 79 in Taylor]
Photograph of Federal Aid Project 279-C (1) and/or FAGM 279-B (1) on U.S. Highway 79 in Taylor. Street scene with new Missouri-Kansas-Texas Railroad underpass and sidewalks. Visible train including Missouri-Pacific boxcar, Green Bay & Western boxcar and MKT gondola.
[Photograph of a Flexible Base Plant]
Photograph of a construction plant with mounds of dirt in the background. There is text on the back that reads "Flexible Base Plant in operation".
[Photograph of Rock Mounds]
Photograph of mounds of rocks from construction. Behind the mounds tree lines are visible as well as open areas of land. Handwritten text on back reads "US Hwy 81, Williamson County, Flexible base material on highway before spreading, 10-9-1939".
[Photograph of Construction on U.S. Hwy 81]
Photograph of construction on U.S. Hwy 81 in Williamson County, Texas. In the background there is a "keep to right" sign and construction equipment. Handwritten text on back reads "US Hwy 81, Williamson County, approaching new construction at north end of project. Traffic routed over new highway for completion of flexible base. Keep to right sign used for safety of traffic. 10-10-39".
[Photograph of Deck Steel]
Photograph of steel beams in a construction site. Handwritten text on back reads "FAP140-C (3) US Hwy 81 Williamson County. Curb forms and deck steel in place, span #3 Dry Berry Creek Bridge - 8-30-39".
[Photograph of Construction Steel]
Photograph of construction steel being placed. Text on back reads "view of dock steel in place, Dry Berry Creek Bridge".
[Photograph of Quarry Area]
Photograph of construction equipment in a construction area. Text on the back reads "view of Flexible Base Plant and quarry in background"
[Photograph of Construction Truck Near Quarry]
Photograph of a construction truck and crane on a quarry. Text on the back reads "Loading flexible base material from Quarry for processing by plant".
[Photograph of Road Sign]
Photograph of a road sign that reads "Begin Detour 500 ft". On either side of the road are open fields of land and cars are visible traveling along the road in the distance. Text on the back reads "Barricades from Sta 875 - Detouring Traffic".
[Photograph of Construction Barricades]
Photograph of construction barricades. There is one man in uniform standing in front of the barricades and one dark color vehicle parked behind the barricades.
[Photograph of Unknown Road #28]
Photograph of an unknown road. There are small fences set up to on the right side of the road and to the left. Text on the back reads "Barricades Sta 846 - Detouring Traffic".
[Photograph of Detour Sign and Barricades]
Photograph of a detour sign with barricades visible in the background. The road is positioned next to an open empty field to the right. Text on the back reads "View of barricades from Sta. 846 - detouring traffic".
[Photograph of Dry Creek Berry Bridge]
Photograph of Dry Berry Creek Bridge. Under the bridge is the dry ground where one man is visible walking by the 3rd support column from the left.
[Photograph of Asphalt Surface Treatment]
Photograph of a construction vehicle rolling along a stretch of asphalt road. On either side of the road are open fields of land. Text on back reads "Asphalt Surface Treatment north from Sta 811f00 Compacting with pneumatic tire roller".
[Photograph of Asphalt Surface Treatment #2]
Photograph of an asphalt section of road after receiving an asphalt surface treatment. Text on back reads. "Asphalt surface treatment north from Sta 826".
[Photograph of Construction Vehicle Applying Surface Treatment]
Photograph of a construction vehicle applying an asphalt surface treatment. There is one worker standing off to the left side of the treatment. Text on the back reads "Asphalt surface treatment north from Sta 864".
[Photograph of Distributor Vehicle]
Photograph of a construction worker on the distributor vehicle. This vehicle is distributing the asphalt surface treatment that is a dark color.
[Photograph of Asphalt Surface Treatment #3]
Photograph of a distribution vehicle applying an asphalt surface treatment.
[South San Gabriel River Bridge on U.S. Highway 81]
Photograph of Old South San Gabriel River truss bridge which was completed in 1882 by Chicago Bridge Company. It will be replaced by Federal Aid Project 140-b (9) Job 15. On U.S. Highway 81 also known as Highway 2 (old designation.)
[Photograph of Old South San Gabriel River Bridge]
Photograph of the Old South San Gabriel River Bridge.
[South San Gabriel River Bridge on U.S. Highway 81]
Photograph of Old South San Gabriel River truss bridge which was completed in 1882 by Chicago Bridge Company. It will be replaced by Federal Aid Project 140-b (9) Job 15. On U.S. Highway 81 also known as Highway 2 (old designation.)
Back to Top of Screen