41 Matching Results

Search Results

First Methodist Church, Ballinger, Texas: Miscellaneous Details

Description: Miscellaneous details for the First Methodist Church in Ballinger, Texas. It includes detail of hanging accordion, details of window frame with return plaster jamb, details of exterior door frame, details of stairs and railing, trim details, details of choir and pulpit, and detail of casement windows.
Date: 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Ballinger High School: Second Story Framing Plan

Description: Architectural plan for a high school building in Ballinger, Texas. It includes drawings that detail the overall framing plan for the floor, various staircases, and beams 217, and 218; there is a beam schedule for the second story created in the top left corner of the sheet.
Date: February 10, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Ballinger High School: Third Story Framing Plan

Description: Architectural plan for a high school building in Ballinger, Texas. It includes details concerning the framing for the third story of the building, as well as a small, detailed drawing of beam 308; the beam schedule in the top left corner of the sheet shows the specifications for various aspects of the framing materials.
Date: February 10, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Ballinger High School: First Story Floor Plan

Description: Architectural floor plan for a high school building in Ballinger, Texas. It includes a drawing of the layout for the building's first story; the plan contains notations for the doors, auditorium, and class rooms. The two schedules in the top left corner of the sheet detail the materials to be used in construction of the windows and doors.
Date: February 10, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen