25 Matching Results

Search Results

Army Mobilization Buildings: Typical Details

Description: Typical details for mobilization buildings in support of war efforts. They include typical cross section, typical end wall framing and part elevation, typical side wall framing for all types, and various smaller sections. Separate notes are included at the bottom right.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Various Sections

Description: Various sections for mobilization buildings in support of war efforts. They include support for steam line roller guide, roof sheathing not shown, support for steam line expansion joint and anchorage, part plan of eave, details of ramp to grade, grade detail, typical cross section, cross section at building, section thru cover over roadway, diagrammatic layouts, and notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Heating Details & Specifications & Smoke Pipes For Ranges

Description: Heating details for mobilization buildings in support of war efforts. They include detail of heat ducts for buildings with trusses, detail of hanger typical for all mains, detail of heat ducts for 1st floor ceiling, detail of typical ducts at ceiling, detail of smoke pipe manifold, detail of smoke pipes for ranges, detail of sleeve, weights of sheet metal, fresh air intake louver, detail of volume control damper, and typical schematic arrangement of heater room equipment.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Smoke Pipe Details

Description: Smoke pipe details for mobilization buildings in support of war efforts. They include detail of smoke pipe for one story building, detail thru duct shaft that is vertical to wall, and detail thru duct shaft that is parallel to wall.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Interior Details

Description: Miscellaneous interior details for mobilization buildings in support of war efforts. They include shelving, lunch counter, work bench, counter, cash drawer, observation window and counter shelf, ticket window, table and mirror in dressing room, shelf and mirror, detail of coal box, bulletin board, screen vent, and fresh air intake louver.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Plumbing Layouts

Description: Plumbing layouts for mobilization buildings in support of war efforts. They include Type L-1 - 25 Men, Type L-2 - 50 Men, Type L-3 - 100 Men, Type L-4 - 150 Men, Type L-5 - 200 Men, Type L-6 - 250 Men, capacities of water heaters and hot water storage tanks, and legend and notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Typical Details

Description: Typical lavatory details for mobilization buildings in support of war efforts. They include a typical cross section, typical side wall framing for all types, typical end wall framing and part elevation, typical cross section, detail of joint in metal lining of showers, coal box, typical end wall framing and part elevation, and various smaller sections.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Lavatories

Description: Lavatory plans for mobilization buildings in support of war efforts. They include floor plan type L-1(25 Men), type L-2(50 Men), type L-3(100 Men), type L-4(150 Men), type L-5(200 Men), type L-6(250 Men), typical elevations, heater room end elevation, toilet room end elevation, notes, heating cabinets chart, electric fixture schedule, and cannon stoves.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing & Partitions

Description: Wall framing and partitions details for mobilization buildings in support of war efforts. It includes typical cross section showing partitions, typical end wall framing & part elevation, typical side wall framing, and various smaller sections.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Typical Details

Description: Typical details for mobilization buildings in support of war efforts. They include typical cross section, typical end wall framing and part elevation, typical side wall framing for all types, and various smaller sections. Separate notes are included at the bottom right.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Details

Description: Miscellaneous details for mobilization buildings in support of war efforts. They include framing when wall occurs at rafter, framing at wall post, details of porch under main roof, details of water closet partitions, shelf and mirror, details of shower, detail of coal box, ladder, bracket, bulletin board, detail of litter hook, screened vent, detail of shelves, cannon stove, mail box, porch and steps on gable end of building, details of porch screens, and details of porch on side of buildings.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Electrical Details

Description: Electrical details for mobilization buildings in support of war efforts. They include explosion proof fixtures, waterproof fixture, reflected plan, typical service diagram, weatherproof fixture with mounting for concealed work and mounting for exposed work, and a legend.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Plumbing Floor Plans

Description: Plumbing floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5-200 Men, floor plan type L-6 - 250 Men, floor plan type L-3 - 100 Men, floor plan type L-1 - 25 Men, floor plan type L-2 - 50 Men, floor plan type L-4 - 150 Men, capacities of water heaters and hot water storage tanks chart, and legend & notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing

Description: Side elevation drawings for mobilization buildings in support of war efforts. They include typical end wall framing & part elevation, typical cross section showing partitions, typical side wall framing, and small sections for roof framing details.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing

Description: Side elevation drawings for mobilization buildings in support of war efforts. They include typical end wall framing & part elevation, typical cross section showing partitions, typical side wall framing, and small sections for roof framing details.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing & Cross Sections

Description: Wall framing and cross sections for mobilization buildings in support of war efforts. They include typical cross section, typical end wall framing and part elevation, typical side wall framing for all types, typical end wall framing and part elevation, and small detailed mechanical sections.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Plumbing Floor Plans

Description: Plumbing floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5-200 Men, floor plan type L-6 - 250 Men, floor plan type L-3 - 100 Men, floor plan type L-1 - 25 Men, floor plan type L-2 - 50 Men, floor plan type L-4 - 150 Men, capacities of water heaters and hot water storage tanks chart, and legend & notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen