Big Lake High School Auditorium: Second Story Framing Plan
Description:
Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a large drawing of the roof framing plan for the second story, as well as smaller drawings that detail individual sections of the framework. There is a roof beam schedule and a column schedule drawn at the top of the sheet.
Date:
December 14, 1954
Creator:
David S. Castle Co.
Partner:
Tittle-Luther/Parkhill, Smith and Cooper, Inc.