Texas Department of Transportation - 414 Matching Results

Search Results

[Photograph of Construction Site]

Description: Photograph of a construction site with various pieces of construction equipment. Below the construction site are support structures holding up the site. Text on the front reads "Dec. 1936" and "H.C. Carter, Res Engr.".
Date: December 1936
Creator: Texas. Department of Transportation.

[Photograph of Construction within a Quarry]

Description: Photograph of construction on a rocky quarry. Construction equipment and cars are visible on the gravel with the rocky landscape on either side. In the background there is a multiple trees visible and one home. Handwritten text on back reads "US Hwy 81, Williamson County, Flexible Base Quarry during operation, 9-17-39"
Date: unknown
Creator: Texas. Department of Transportation.

[Photograph of Deck Steel]

Description: Photograph of steel beams in a construction site. Handwritten text on back reads "FAP140-C (3) US Hwy 81 Williamson County. Curb forms and deck steel in place, span #3 Dry Berry Creek Bridge - 8-30-39".
Date: August 30, 1939
Creator: Texas. Department of Transportation.

[Photograph of Detour in East End]

Description: Photograph of the beginning of a road detour in the east end of a project. Two roads meet at an intersect where the detour starts. At the end of one road is a barricade blocking incoming traffic. In the background are empty fields and telephone poles. There is one sign to the right that reads "Detour 3 1/2 mi. long. Drive Slow".
Date: April 12, 1939
Creator: Texas. Department of Transportation.

[Photograph of Dirt Road #5]

Description: Photograph of an unknown dirt road. To the left side of the road there are multiple cars around a small building structure. To the right there are open empty fields and one car parked on the shoulder of the road.
Date: February 5, 1939
Creator: Texas. Department of Transportation.
Back to Top of Screen