69 Matching Results

Search Results

Additions to Weinert Public School, Weinert, Texas: First Floor Plan

Description: First floor plan for a school building. It features wall edge lines, measurements, labels, and room names. A full size blackboard trim rendering is included to the right.
Date: June 23, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka Ward School, Tahoka, Texas: Elevation Renderings

Description: Elevation renderings for a school building. Sections include details of entrance with left elevation and front elevation, details of trim, detail of roof & truss, plan of entrance, section "A-A", and section "B-B".
Date: June 1920
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka High School, Tahoka, Texas: Rear Elevation Rendering

Description: Rear elevation rendering for a school building. It features wall edge lines, measurements, doors, and windows. Other sections include detail of library counter, and elevation & section of shower stalls.
Date: June 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka High School, Tahoka, Texas: Third Floor Framing Plan

Description: Third floor framing plan for a school building. It features wall edge lines, measurements, labels, and framing lines. Other sections include detail of steel trusses over auditorium, detail of sway bracing between trusses, and beam details.
Date: June 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Wingate High School Building, Wingate, Texas: Elevation Renderings

Description: Elevation renderings for a school building. Sections include front elevation, rear elevation, typical end elevation, basement stair diagram, stair diagram, elevation shower & toilet stalls, section of shower partition cap, and details of toilet & shower stalls.
Date: June 5, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka High School, Tahoka, Texas: First Floor Plan

Description: First floor plan for a school building. It features wall edge lines, measurements, labels, and room names. A window schedule is included to the bottom left.
Date: June 22, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Westbrook High School Building, Westbrook, Texas: Wall, Rail, & Window Details

Description: Wall, rail, and window details for a school building. Sections include detail of stair rail, detail of typical window, detail of interior doors, detail of proscenium arch, transom detail, elevation of proscenium, outside door detail in 13' wall, roof plan of auditorium, full size base, detail of stage floor, full size hand rail, full size black board detail, full size riser & trade, full size window stool & apron, full size picture mold, full size casing, and full size wainscot cap.
Date: June 26, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka Ward School, Tahoka, Texas: Door, Window, & Elevation Details

Description: Door, window, and elevation details for a school building. Sections include a door diagram, detail of wardrobe shelf, wardrobe elevation, details of blackboard construction, detail of doors, detail of double hung windows, and details of pupils wardrobe.
Date: June 22, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka High School, Tahoka, Texas: Front Entrance Elevation

Description: Front entrance elevation rendering for a school building. It features wall edge lines, columns, windows, and measurements. Other sections include a wall section, plan, and front entrance doors.
Date: June 22, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For Tahoka High School, Tahoka, Texas: Column, Footing, & Beam Schedules

Description: Column, footing, and beam schedules for a school building. Sections include first floor beam schedule, second floor beam schedule, third floor beam schedule, roof beam schedule, and column & footing schedule.
Date: June 22, 1926
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen