286 Matching Results

Search Results

Gymnasium Shop & Band Room Building For Sonora, Texas: Footing Plan

Description: Footing plan for a school building. It features wall edge lines, column placement, and measurements. Other sections include pier & footing schedules, notes, detail typical footing, detail footing for flue, detail boiler room steps, and detail locker room steps.
Date: October 15, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Gymnasium Shop & Band Room Building For Sonora, Texas: Elevation Renderings

Description: Elevation renderings for a school building. Sections include rear elevation, left side elevation, right side elevation, front elevation, detail of door frame for door 8, and detail of pilaster cap.
Date: October 15, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

An Addition and Repairs to the Mexican School Building, Sonora, Texas: Blackboard, Toilet, & Stall Details

Description: Blackboard, toilet, and stall details for a school building. Sections include cross section X-X, 3" detail of blackboards, detail of blackboard trim, casing, wood base, wainscot cap, picture mold, brick mold, toilet & shower stall elevation, and toilet & shower stall plan.
Date: December 9, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

An Addition and Repairs to the Mexican School Building, Sonora, Texas: Door, Window, & Wall Renderings

Description: Door, window, and wall for a school building. Sections include typical wall & rear entrance detail, section B-B, 3" scale detail of kalamein door frame, typical window frame detail, and window frame parts. The window frame parts include muntin, meeting rail, mullion, jamb, and head.
Date: December 9, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

An Addition and Repairs to the Mexican School Building, Sonora, Texas: Elevation Renderings

Description: Elevation renderings for a school building. Sections include scale coping detail, scale downspout head detail, plaster opening in home making laboratory, right end elevation of home making wing, front elevation of home making wing, left end elevation of home making wing, and rear elevation.
Date: December 9, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Business Building, Abilene, Texas: Elevation Renderings

Description: Elevation renderings for a business building commissioned by H. O. Wooten in Abilene, Texas. Sections include east alley elevation, west Cypress Street elevation, south N. 4th Street elevation, corner elevation, and side elevation canopy. They have windows, doors, and elevation measurements.
Date: November 30, 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Mullin High School, Mullin, Texas: Miscellaneous Plans

Description: Miscellaneous plans for additions to a high school building in Mullin, Texas. It includes foundation plan, floor plan, roof plan, rear elevation, end elevation, and section of classroom.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Mullin High School, Mullin, Texas: Plans, Elevations, and Details

Description: Plans, elevations, and details for a high school building in Mullin, Texas. It includes typical wall section, details of doors, detail of classroom windows, detail of raised panels, detail of blackboards in classroom, foundation plan, floor plan, roof plan, rear elevation, end elevation, room finish schedule, window schedule, and door schedule.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Mullin High School, Mullin, Texas: Miscellaneous Details

Description: Miscellaneous details for a high school building in Mullin, Texas. It includes section through bleachers, detail of steel sash, detail of portable steps, roof plan, detail section, details of door frame, detail of stage front, and detail of girls shower stall.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Gymnasium, Noodle, Texas: Miscellaneous Details

Description: Miscellaneous details for a high school gymnasium in Noodle, Texas. It includes section through bleachers, detail of steel sash, detail of window, details of interior and exterior door frames, frame partition details, roof plan, and detail of typical shower stall.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Mullin High School, Mullin, Texas: Outdoor Toilet and Septic Tank Plans

Description: Outdoor toilet and septic tank pans for a high school building in Mullin, Texas. It includes plan of toilet seat and cover, detail of seat cover, plan, end elevation, sections, and drainage layout.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church Educational Building, Breckenridge, Texas: Elevations and Details

Description: Elevation and details for an educational building at First Baptist Church in Breckenridge, Texas. It includes north and front elevations of the building's exterior, as well as typical toilet stall detail and a typical wall section with brick veneer construction.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church Educational Building, Breckenridge, Texas: Second Floor Plan

Description: Second floor plan for an educational building at First Baptist Church in Breckenridge, Texas. It includes a detailed floor plan, section detail of wood step, section of cement tread and risers, section of stair rail, and plan of staircase.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church Educational Building, Breckenridge, Texas: Roof Plan

Description: Roof plan for an educational building at First Baptist Church in Breckenridge, Texas. It includes a detailed layout of the building's roof, detail of splash blocks, detail of typical downspout, roof truss detail, and section at roof.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church Educational Building, Breckenridge, Texas: Foundation Plan

Description: Foundation plan for an educational building at First Baptist Church in Breckenridge, Texas. It includes a detailed layout of the building's foundation, pier and footing schedule, typical pier and footing diagram, and grade beam elevations.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church Educational Building, Breckenridge, Texas: Foundation Plan

Description: Foundation plan for an educational building at First Baptist Church in Breckenridge, Texas. It includes a detailed layout of the building's foundation, a pier and footing schedule, beam schedule, detail of typical external grade beam, detail of typical footing, and miscellaneous plans, section, and elevation related to pipes.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Mullin High School, Mullin, Texas: Miscellaneous Details

Description: Miscellaneous details for a high school building in Mullin, Texas. It includes floor plan, foundation plan, left side elevation, right side elevation, end elevation, cross section through gymnasium-auditorium, detail of roof framing, sections looking at bleachers and stage, finish schedule, door schedule, steel sash schedule, and window schedule.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen