444 Matching Results

Search Results

Mullin High School, Mullin, Texas: Plans, Elevations, and Details

Description: Plans, elevations, and details for a high school building in Mullin, Texas. It includes typical wall section, details of doors, detail of classroom windows, detail of raised panels, detail of blackboards in classroom, foundation plan, floor plan, roof plan, rear elevation, end elevation, room finish schedule, window schedule, and door schedule.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church Educational Building, Breckenridge, Texas: Elevations and Details

Description: Elevation and details for an educational building at First Baptist Church in Breckenridge, Texas. It includes north and front elevations of the building's exterior, as well as typical toilet stall detail and a typical wall section with brick veneer construction.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church Educational Building, Breckenridge, Texas: Foundation Plan

Description: Foundation plan for an educational building at First Baptist Church in Breckenridge, Texas. It includes a detailed layout of the building's foundation, a pier and footing schedule, beam schedule, detail of typical external grade beam, detail of typical footing, and miscellaneous plans, section, and elevation related to pipes.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church Educational Building, Breckenridge, Texas: Second Floor Framing Plan

Description: Second floor framing plan for an educational building at First Baptist Church in Breckenridge, Texas. It includes a detailed framing plan, detail of furring and joist support, detail of connection of I beams, and detail of wall support I beams.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Mullin High School, Mullin, Texas: Miscellaneous Details

Description: Miscellaneous details for a high school building in Mullin, Texas. It includes floor plan, foundation plan, left side elevation, right side elevation, end elevation, cross section through gymnasium-auditorium, detail of roof framing, sections looking at bleachers and stage, finish schedule, door schedule, steel sash schedule, and window schedule.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

High School Gymnasium, Noodle, Texas: Elevations, Sections, and Floor Plan

Description: Elevations, sections, and floor plan for a high school gymnasium in Noodle, Texas. It includes elevations of the front, rear, and side exteriors of the building, as well as a floor plan, foundation plan, detail of roof framing, cross section and longitudinal section through gymnasium, finish schedule, door schedule, steel sash schedule, and wood window schedule.
Date: 1938
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

McMurry College President's Home, Abilene, Texas: First Floor and Foundation Plans

Description: Floor plan of the first floor and foundation plan for a residence commissioned by McMurry College in Abilene, Texas. It includes a drawing of the home's foundation plan on the left and a drawing of the floor plan for the first floor of the home. Also included are details for the front terrace and of the rear stoop, and a column and footing schedule.
Date: 1938~
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen