39 Matching Results

Search Results

Rhodes & Chapple Office Building, Midland, Texas: Entrance, Window, & Door Details

Description: Entrance, window, and door details for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. Sections include details at doors, typical section at windows, section at glass block, section between windows, 1/2 plan at entrance, and 1/2 plan of granite sill.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: Footing Details

Description: Footing details for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. Sections include details of footing under piers #32 & #33, details of footing under piers #58 & #59, details of footing under piers #36 & #37, and details of footing plinth & columns for column #28, #29, #30, & #31.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: Second Floor Plan

Description: Second floor plan for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. It includes measurements, wall edge lines, and labels. Other sections include a scupper head detail, detail of flashing stub column at wall, detail of stub column flashing, and detail of drain trough.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: Basement Plan & Beam Details

Description: Basement plan and beam details for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. The basement plan includes wall edge lines, measurements, labels, and column placement. Other sections include grade beam details, beam & slab reinforcing types, stirrup types, detail of typical steel placement in beams, detail of grade beams G-1 & G-2, typical wall reinforcement, first floor & basement floor slab schedule, notes, and grade beam schedule.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: First Floor & Basement Plans

Description: First floor, basement, & tunnel plans for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. The first floor plan has room numbers, wall edge lines, room names, measurements, and labels. The basement & tunnel plan has column placement, wall edge lines, and labels. The basement plan has labels, notes, measurements, and wall edge lines. Notes and a legend are included above.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: Second Floor Framing

Description: Second floor framing plan for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. It includes framing lines, measurements, labels, and column placement. Other sections include framing details, detail of stack opening, general notes, beam notes, slab notes, 2nd & 3rd floor slab schedule, and second floor beam schedule.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: Framing Details

Description: Framing details for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. Sections include 2nd floor framing plan of entrance lobby, roof framing plan of entrance lobby, 1st floor framing plan of entrance lobby, detail of slab openings for ducts, and many small beam framing sections.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: Second Floor Plan

Description: Second floor plan for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. It includes wall edge lines, measurements, labels, and directional lines. Other sections include second floor plumbing, electrical riser diagram, a meter schedule, and an electrical code.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: Third Floor Plan

Description: Third floor plan for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. It includes wall edge lines, measurements, labels, and room names. Other sections include detail of labeled metal door frame for door number 4 in 6" & 12" wall, typical detail of metal door frame in 2" partition, door schedule, window schedule, and room finish schedule.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: First Floor & Basement Plans

Description: First floor and basement plans for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. The first floor plan and basement plan include wall edge lines, measurements, labels, and directional lines. Other sections include a plot plan and first floor plumbing.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Rhodes & Chapple Office Building, Midland, Texas: Elevation Renderings

Description: Elevation renderings for an office building commissioned by R. R. Rhodes and Dr. J. H. Chapple in Midland, Texas. Sections include east elevation, south elevation, north elevation, and west elevation. They have doors, windows with circled letters, labels, and measurements.
Date: 1946
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen