Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS Page: 118 of 264
View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
END COVER THERMAL /STRUCTURAL INSULATION
ANTI-ROTATION PIN LOCK RING
HOUSING
0-RING SEAL -
INSULATION\ '
INSULATION x
ELECTRICAL
HEATER- -
EMERGENCY
COOLING SYSTEM \
RADIATION
BARRIER
ASSEMBLY I
r\ B
THERMAL ':-
INSULATION 0-RING SEAL
ANTI-ROTATION THERM AL MOUNTING POINT
PIN STRUCTURAL LOCK RING
THERMAL INSULATION END COVER -OUTER
INSULATION
LOCK RING
ANTI-ROTATION PIN
END COVER-INNER ELECTRICAL
RECEPTACLE
FIGURE 3.5.1.2-1A
ELECTRICAL HEAT SOURCE ASSEMBLY104
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS, report, March 15, 1978; Timonium, Maryland. (https://texashistory.unt.edu/ark:/67531/metadc1055866/m1/118/: accessed July 16, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.