Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS Page: 12 of 264
View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
LIST OF FIGURES (CONT.)
TITLE FIGURE NO.
Relationship of Tube Weight to No-Puncture
Probability
Relationship of Radiator Weight to Tube
and Header Probability
Armor Requirement as a Function of No-Puncture
Probability
Spectral Directional Reflectance of Two
White Paint Specimens
Hemispherical Emittance of White Paint
Specimens at Temperatures from -1600F
to 2660F
KIPS Isothermal Tube Test Pressure Drop
Between Radiator Tube Pressure Taps
Versus Reynolds Number
KIPS Flow Test-Moody Friction Factor Versus
Reynolds Number
Radiator Short Panel in T/V Chamber
KIPS Short Panel T/V Test Heat Rejection
Versus Mass Flow Per Tube
Radiator Long Panel in-Air Test
KIPS Long Panel Flow Test Total Pressure
Drop Versus Mass Flow Per Tube
KIPS Long Panel Flow Test Extrusion Pressure
Drop Versus Mass Flow Per Tube
KIPS Long Panel Flow Test Header Pressure
Drop Versus Mass Flow Per Tube
Extrusion/Adapter to Header Termination
Radiograph Technique Weld Specimen
NDT Radiograph Technique
Extrusion/Header to Header Weld Test Sample
Extrusion/Adapter Weld
Adapter to Extrusion Weld (Obsolete Design)
Metallography of Extrusion/Adapter Subassembly
to Header Weld
Metallography of Extrusion/Adapter Subassembly
to Header Weld3.5.2.6-9
3.5.2.6-10
3.5.2.6-11
3.5.2.6-12
3.5.2.6-13
3.5.2.6-14
3.5.2.6-15
3.5.2.6-16
3.5.2.6-17
3.5.2.6-18
3.5.2.6-19
3.5.2.6-20
3.5.2.6-21
3.5.2.6-22
3.5.2.6-23
3.5.2.6-24
3.5.2.6-25
3.5.2.6-26
3.5.2.6-27
3.5.2.6-28
3.5.2.6-29vi
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS, report, March 15, 1978; Timonium, Maryland. (https://texashistory.unt.edu/ark:/67531/metadc1055866/m1/12/: accessed July 16, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.