Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS Page: 14 of 264
View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
LIST OF TABLES (CONT.)
TABLE NO.
Expected Load Environments
Aluminum Alloys Based on Load Environment
Structural Design Criteria
Radiator Structure Weight
Values of Solar Absorptmon and Normal and
Hemispherical Emittance of White Paint
Specimens3.5.2.6-IV
3.5.2.6-V
3.5.2.6-VI
3.5.2.6-VII
3.5.2.6-VIIIviii
TITLE
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS, report, March 15, 1978; Timonium, Maryland. (https://texashistory.unt.edu/ark:/67531/metadc1055866/m1/14/: accessed July 16, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.