Railroad Commission of Texas Drilling, Completion, and Plugging Summary: October 1983 Page: Front Cover
2 p.View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
TxD
R s3 &NON-CIRCULAT I NG
Se53 %3/IO
TEXAS STATE DOCUMENTS
COLLECTIONState Totals
This 1983 1982
Period ToDate To DateCOMPLETIONS
Oil Discovery
Oil Existing Field
Oil Completions-Total
Gas Discovery
Gas Existing Field
Gas Completions-Total
Service Completions-TotalTOTAL COMPLETIONS
NEW HOLES DRILLED
Oil Discovery
Oil Existing Field
Oil Holes-Total
Gas Discovery
Gas Existing Field
Gas Holes-Total
Service Holes-Total
*Dry Wildcat
*Dry Existing Hole
*Dry Holes-Total
TOTAL NEW HOLES DRILLED38
1,401622
12,426544
12,994Activity by
District for This Period
01 02 03 04 05 06 7B 7C 08 8A 09 10
0
2071
2112
1307
230
322
306 0
136 1042
2234
1424
2291 439 13,048 -13,538 207 22 142 30 32 32 142 104 225 146 233 ]
71 1,045 1,210 0 17 16 .19 0 8 3 2 1 0 2
269 3,264 4,073 13 13 40 38 7 23 63 17 6 1 22
340 4,309 5,283 13 30 56 57 7 31 66 19 7 1 24
18 488 518 0 0 1 1 0 0 4 10 1 1 043
1,400602
11,927535
12,422220
5
20652 199
1
2012
1300
124124
3
26
29
088 39 63 212 133 233 148 257 153
7
230
322
306
1360 2
104 2234
1434
2290
124~1,443 12,529 12,957 211 21 142 30 32 32 142 104 225 147 233
50 828 1,064 0 8 12 14 0 8 3 1 0 0 1
220 2,517 3,507 13 8 17 34 7 23 53 16 5 1 17
270 3,345 4,571 13 16 29 48 7 31 56 17 5 1 18
21 476 501 0 3 1 1 0 0 4 10 1 1 0
283 2,524 1,942 23 19 25 46 13 31 60 8 0 23 28
265 2,418 2,200 28 6 27 13 19 15 45 15 18 8 68
548 4,942 4,142 51 25 52 59 32 46 105 23 18 31 962 9282
21,292
22,171
275
65 224 138
124
3
26
29
0
7
3
1071 109 307 154 249 180 347 '163
HOLES PLUGGED
Oil 412 3,135 2,386 58 31 8 37 3 25 35
Gas 118 1,087 1,642 10 26 14 23 6 10 4
Service 36 297 216 0 4 2 1 1 3 2
*Dry 548 5,029 4,266 51 25 52 59 32 46 105
TOTAL HOLES PLUGGED 1,114 9,548 8,510 119 86 76 120 42 84 1469 54 52 85 15
10 3 5 7 0
6 5 10 2 0
23 18 31 96 10
48 80 98 190 25Notes Total Completions include 41 Dual Oil, 34 Dual Gas, 2 Triple Oil,
* Dry hole data not comparable due to changes in reporting system-and 1 Triple Gas
TSU yg NON CIRCULATING
RAILROAD. COMMISSION OF TEXAS
DRILLING, COMPLETION, AND PLUGGING SUMMARY
FOR PERIOD,- OCOTBER 1, 1983 THROUGH OCTOBER 31, 1983v v
.
-
1,797
17 ,845
19 ,-3-3-9
'wffi'AvrA Aa -.?& aW- rcr Qa a ,*-I%100%
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Railroad Commission of Texas. Railroad Commission of Texas Drilling, Completion, and Plugging Summary: October 1983, report, October 1983; Austin, Texas. (https://texashistory.unt.edu/ark:/67531/metapth1031754/m1/1/: accessed July 17, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.