Re-evaluation of DART Orange Line DFW Airport Extension Irving-3 Environmental Assessment: Final: Searching Inside

We Found:

17 results that matched your query.

Page: 160 (standard view) | zoom view

... EX1-1-6: FEMA FIRM Map APPENDIX Location Map Time of Concentration and Discharge Calculation DART Manual -... Engineering Inc. Dallas Area Rapid Transit Light Rail Project - Design Criteria Manual Volume 1 Facilities

Page: 178 (standard view) | zoom view

... of Concentration and Discharge Calculation DART Manual - Intensity-Duration-Frequency (IDF) Curve REFERENCE Orange... Transit Light Rail Project - Design Criteria Manual Volume 1 Facilities Design (Baselined Version

Page: 184 (standard view) | zoom view

... of Concentration and Discharge Calculation DART Manual - Intensity-Duration-Frequency (IDF) Curve REFERENCE Orange... Transit Light Rail Project - Design Criteria Manual Volume 1 Facilities Design (Baselined Version

Page: 96 (standard view) | zoom view

.... Temporary Traffic Control of the Texas Manual on Uniform Traffic Control Devices (TMUTCD) and Part 6.... Temporary Traffic Control of the federal Manual on Uniform Traffic Control Devices shall be implemented

  • Enclose phrases in quotation marks.
  • Use alternate spellings.
  • Limit or remove special characters and punctuation.

When this item was originally scanned, we used Optical Character Recognition (OCR) technology to "read" and save text embedded in the image. OCR is not fool-proof, however. While the overall quality of the OCR results is generally good, the results may vary depending on legibility of the original materials.

Back to Top of Screen