Records of Wells, Water Levels, Pumpage and Chemical Analyses of Water from the Carizzo Aquifer in the Winter Garden Area, Texas, 1970 through 1977 Page: 7
iv, 120, [5] p. : ill., mapsView a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
ATASCOSA COUNTY
Table 2. --Records of Wells Drilled Between Spring 1970 and Spring 1977
All wells are drilled uless otherwise noted in remarks column.
Water Level : Reported water levels given in feet; measured water levels gives to the nearest tenth or hundredth of a foot.
Method of lift and type of power: C, cylinder; of, centrifugal; E, electric; 0, gasoline, butane, or diesel engine; H, hand; N, none; Ng, natural gas; Sub, submersible;
T, turbine; W, windmill. Number indicates horsepower.
Use of water : D, domestic; Ind, industrial; Irr, irrigation; N, none; F, public supply; B, livestock.
Water-bearing mait : Kochb, Edwards and associated limestones (Balcones Pault Zume aquifer); Twi, Wilcox Group; To, Carrio Sand; Tb, Bigiord Member; Tep,
El Pico Clay; Tqc, Queen City Band; Tla, Laredo Formation; To, Sparta Sand; Tms, Maunt Selman Pormation; Tom, Cook Mauntain Pormation;
Ty, Yegum Formation; Tj, Jackson Group; Tot, Catahoula Tuff; Tok, Oakville Sandstone; Qle, Lemma Pormation.Casing Wat er level
Depth Altitude Below
Date of Dham- Water of land land- Date of Method Use
Well Owner Driller completed well eter Depth bearing surface sotrface measurement of of -Remarks
(it) (in.) (it) unit (it) datum lift water
(ft)
AL-68-5l-454 Martin Farms Dtrickers Water Well 1971 500 8 500 Twei 700 -- -- Dub, S Irr Slotted iron 40 to 500 ft. Pump set at 400 ft.
ServiceReported yield 180 gal/nin.41
52-407 Tom Wilborn Milan Drilling Co. 1975 330 6 330 Twi 712 160.20 Sept. 4, ,1975 Suh, S Irr, Slotted froo 300 to 330 ft. Gravel packed.
5 5, 5 Reported yield 55 gal/oin.)/
4DB Palo Alto Subdivision B. 51. Cannon Drilling 1970 474 16 124 Twi 710 220 Oct. 1970 Dub, B P Slotted from 324 to 474 ft. Cemented iron 100 ft
Co. 8 474 7-1/2 to surface. Gravel packed. Pump set at 400 ft.
Reported yield 55 gal/min. Development test:
Drasedown of 90 ft pumping 55 gal/nmn for 48 hours
- in Get. 1970.)/
* 715 Big T Development Co. Crawford B. Gordon 1971 674 8 674 Twi 675 191 May 10, 1971 Sub, R P Slotted from 494 to 674 ft. Cemented from 50 ft
10 to surface. Pump net at 400 ft. Reported yield
100 gal/mmn. Development test: Draedown of 200
ft pumping 325 gal/mmn for 25 hours on May 10,
1971.y
* 716 do do 1971 636 B 636 Twi 675 lBS June 3, 1971 Sub, S P Slotted from 476 to 636 ft. Cemented from 47 ft
15 to surface. Pump set at 400 it. Reported yield
140 gal/mis. Development test: Drawdown of 200
it pumping 350 gal/min for 35 hours on June 3,
1971.4
717 Shalimar Water Corp. Adeock Pipe & Supply 1973 448 12 50 To 655 147 Apr. 18, 1973 N N Plugged. Slotted from 274 to 448 ft. Cemented
7 44B from 50 it to surface.4
53-704 Edwin ESpey Crawford S. Gordon 1972 430 12 406 To 470 -- -- T N Open hole from 406 to 430 it. Cemented from 200
it to surface. Gravel packed. loused industrial
and irrigation well since 1976. Pump net at 150
ft. Reported yield 650 gal/min. Development tent:
Drawdown of 60 it pumping 1,250 gal/mmn on July
20, 1972.)/
808 George torus do 1971 600 12 600 To 502 .122 July 10, 1971 T, G Irr Slotted from 462 to 600 it. Gravel packed.
175 Development test: Drawdown of 45 ft pumping
1,016 gal/mmn for 12 hour on July 10, 1971./
58-606 Vesta Taylor Lawrence & Joe Swiero 1971 401 12 401 To 552 -- -- T, 0 Icr Slotted from 211 to 401 ft. Gravel packed.
Development test: Drawedmen of 100 it pumping
1,505 gal/nmn on Dec. 3, 1971.J/
59-102 Kenneth Leonards do 1971 380 12 380 To 580 -- -- T, 0 Icr Slotted from 170 to 380 ft. Gravel packed. Pump
150 net at 170 ft.)/
310 Eichoas Rotate Olaf L. Boone 1972 390 12 390 To 561 113 May 1972 N N Abandoned. Slotted irm 206 to 390 it. Gravel
packed. Pump set at 240 it. Development .test:
Drawdown of 78 it pumping 1,851 gal/mmn in May
1972.4
311 Emary Pranklis Rudy's Pin-it Shop 1975 341 12 341 To 570 139 July 4, 1975 *T, 0 Irr Slotted from 181 to 341 it. Cemented from 108
150 ft to surface. Gravel paoked.4
See footnotes at end of table.
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Elder, Glenward R.; Duffin, Gail L. & Rodriguez, Eulogio, Jr. Records of Wells, Water Levels, Pumpage and Chemical Analyses of Water from the Carizzo Aquifer in the Winter Garden Area, Texas, 1970 through 1977, report, September 1980; Austin, Texas. (https://texashistory.unt.edu/ark:/67531/metapth1203994/m1/13/: accessed August 15, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.