Regional Water Plan: Region C, 2016, Volume 1. Main Report Page: Es.21
1000 p. : ill. ; 28 cm.View a full description of this report.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
Table ES.3
Summary of Recommended Strategies - Region C WWPs and WUGs*
*volumes shown in gray italics are infrastructure projects to utilize the supply volumes from other strategies2016 Region C Water Plan
First Year 2070 Year 2070
Decade First Decade Water Estimated
First Decade Water Estimated Annual Supply Annual Average
Entity Recommended Strategy Capital Cost Cost Table of Water Supply Average Unit Cost Volume Unit Cost
AStratUnegyst VoVmoUnumCse
Strategy Volume ($/acre-foot/year) (acre- ($/acre-
(acre- feet/year) foot/year)
feet/year)
Watauga Increase delivery infrastructure North Richland $1,874,676 Q-199 2020 980 $69 1,225 $9
uga ~Hills/Fort Worth$184
Increase delivery infrastructure from Ft Worth; joint $2,961,000 Q-197 2020 42 $162 3,335 $13
Westlake*$29100 -172242$63,5$3
project with Ft Worth, Westlake, Trophy Club
Tarrant County Steam Electric Direct reuse $13,080,000 Q-196 2030 1,528 $560 2,360 $94
Wise County
Bridgeport 2 MGD WTP Expansion $8,911,000 Q-13 2050 40 $948 1,121 $283
Bridgeport 1.5 MGD WTP Expansion $7,844,000 Q-13 2070 489 $1,916 489 $1,916
Bridgeport Expand Capacity of Lake intake and Pump Station $766,100 Q-200 2050 40 $50 1,610 $11
Chico Increase delivery capacity from West Wise SUD $3,610,000 Q-201 2050 14 0 $942 369 $124
New Fairview Connect to Rhome (TRWD through Walnut Creek SUD) $3,662,000 Q-202 2030 34 $1,619 221 $238
Newark Connect to Rhome (TRWD through Walnut Creek SUD) $2,548,000 Q-203 2030 51 $371 646 $42
Runaway Bay 0.5 MGD Water Treatment Plant Expansion $4,078,000 Q-13 2070 100 $4,855 100 $4,855
Runaway Bay Increase capacity of lake intake $52,500 Q-204 2070 100 $51 100 $51
West Wise SUD 0.8 MGD Water Treatment Plant Expansion $5,697,000 Q-13 2050 54 $2,209 308 $661
Wise County Manufacturing New wells $1,636,600 Q-205 2020 250 $757 250 $209Year 2020 Year 2030 Year 2040 Year 2050 Year 2060 Year 2070
Water Water Water Water Water Water
Supply Supply Supply Supply Supply Supply
Volume Volume Volume Volume Volume Volume
(acre- (acre- (acre- (acre- (acre- (acre-
feet/year) feet/year) feet/year) feet/year) feet/year) feet/year)
980 1,119 1,254 1,208 1,192 1,225
42 705 1,596 2,181 2,765 3,335
0 1,528 2,360 2,360 2,360 2,360
40 827 1,121
489
0 0 0 40 827 1,610
0 0 0 140 246 369
0 34 71 119 165 221
0 51 147 261 437 646
0 0 0 0 0 100
0 0 0 0 0 100
0 0 0 54 172 308
250 250 250 250 250 250E S.21
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Freese and Nichols, Inc. Regional Water Plan: Region C, 2016, Volume 1. Main Report, report, December 2015; Fort Worth, Texas. (https://texashistory.unt.edu/ark:/67531/metapth838641/m1/59/: accessed July 17, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.