UNT Libraries Government Documents Department - 147 Matching Results

Search Results

Bicycle Mobility Plan - Long Range Plan

Description: Report describing the results of a transportation study in Bexar County, including "overall goals and objectives for bicycle mobility planning" (abstract) as well as an overview of existing conditions at the time of the study, recommendations and outlined steps for improvement, funding sources, and additional areas of consideration.
Date: February 14, 1995
Creator: Metro Systems Engineering

Edwards Aquifer Hydrogeologic Status Report for 1992

Description: Report on the status of the Edwards Aquifer, discussing current and historic water levels, trends, and water quality.
Date: August 1993
Creator: Edwards Underground Water District (Tex.). Field Operations Division.

FY 2000-2003 Transportation Improvement Program: San Antonio-Bexar County Metropolitan Area

Description: Report from the San Antonio-Bexar County Metropolitan Planning Organization outlining projects funded by the federal and state governments for fiscal years 2000-2003 that would affect San Antonio and the immediate region. It includes background on transportation in San Antonio, various issues, and a breakdown of the projects and funding.
Date: June 21, 1999
Creator: San Antonio Metropolitan Planning Organization

Mobility 2025: Metropolitan Transportation Plan

Description: Report on San Antonio-Bexar County's Metropolitan Transit Plan. The plan addresses improving roadway capacity, maintaining existing roadways, improving public transportation services, and other transportation improvements such as bicycle and pedestrian improvements.
Date: December 1999
Creator: San Antonio Metropolitan Planning Organization

San Antonio - Bexar County Freight Movement Study: Long Range Plan

Description: Report documenting the results of a study of freight movement analysis, performed in order to yield information to planners and transportation practitioners regarding current patterns of freight movement, local generators or recipients of freight, points of traffic congestion within San Antonio, the likely degree of freight growth within and through the region, and potential mitigating measures that can be undertaken to accommodate the impending changes in traffic volumes.
Date: March 1995
Creator: Texas A & M Transportation Institute

San Antonio - Bexar County High-Occupancy Vehicle Study, Long Range Plan - FINAL REPORT

Description: This report identifies major San Antonio freeways and arterials which may be potential candidates for future development of high-occupancy vehicle (HOV) facilities. The report outlines the methodology used in determining the viability of each roadway corridor and summarizes the results of each step of the study.
Date: December 1994
Creator: HNTB Corporation
Back to Top of Screen