UNT Libraries Government Documents Department - 486 Matching Results

Search Results

Angelina & Neches River Authority Annual Financial Report: 2011 and 2012

Description: Annual financial report of the Angelina & Neches River Authority containing independently-audited financial information for fiscal years 2011 and 2012, including statements of assets, expenses, revenues, and cash flows, with supplementary notes and information.
Date: January 2013
Creator: Angelina & Neches River Authority (Tex.)

Angelo State University Annual Financial Report: 2013

Description: Annual financial report of Angelo State University for fiscal year 2013 providing statements of assets, revenues, expenses, bond information, and other relevant data.
Date: Autumn 2013
Creator: Angelo State University

MASH Test 3-21 on TL-3 Thrie Beam Transition Without Curb

Description: Report evaluating the impact performance of a modified TxDOT thrie beam transition to rigid concrete barrier without a curb element below the transition rail.
Date: January 2013
Creator: Arrington, Dusty R.; Bligh, Roger P. & Menges, Wanda L.

A Cultural Resources Survey of a Portion of the Proposed Oncor Electric Delivery Killeen Switch to Fort Hood Tap 138 kV Transmission Line Rebuild, Bell County, Texas

Description: A report on the findings of an archaeological survey of the proposed site of the Oncor Electeric Delivery Killeen Switch to Fort Hood Tap 138kV Transmission Line rebuilding project in Bell County, Texas to determine whether there were any cultural resources in the area.
Date: August 2013
Creator: Atkins North America, Inc.

Pretension Box Beams: Prestress Transfer and Shear Behavior

Description: Study results of shear behavior of prestressed concrete U-beam end blocks along with experimental program and program results.
Date: 2013
Creator: Avendaño, Alejandro; Hovell, Catherine; Moore, Andrew; Dunkman, David; Nakamura, Eisuke; Bayrak, Oguzhan et al.

Development and Testing of a Non-Pinned Low-Profile End Treatment

Description: This is report on the testing of Low-Profile barriers without anchoring vertical steel pins. The project was conducted to provide the Texas Department of Transportation to evaluate the performance of the Low-Profile barrier system.
Date: October 2013
Creator: Beason, W. Lynn; Brackin, Michael S.; Bligh, Roger P. & Menges, Wanda L.

Texas Highway Funding Options

Description: A report on highway funding options in Texas prepared before the 2013 Texas Legislative Session.
Date: August 2013
Creator: Boske, Leigh B.; Gamkhar, Shama; Harrison, Robert; Diamond-Ortiz, Andres D.; Harwin, Alexandra L.; Lazarus, Dana R. et al.

Flexible Pavement Narrow Widening Best Practices and Lessons Learned

Description: This report addresses problems with construction quality and performance on narrow widening projects. The report covers constraints regarding construction equipment widths and other limitations.
Date: November 2013
Creator: Burton, Maria; Kim, Moo Yeon; Smit, Andre; Trevino, Manual; Wu, Hui; Murphy, Mike et al.

Caesar Kleberg Wildlife Research Institute Report of Current Research: 2013

Description: Annual report of the Caesar Kleberg Wildlife Research Institute discussing the institute's personnel and finances as well as compiled papers summarizing in-progress and completed research, with biographical information about authors and in-press publications.
Date: December 2013
Creator: Caesar Kleberg Wildlife Research Institute
Back to Top of Screen