65 Matching Results

Search Results

Abilene City Hall Alterations: Revised Heating and Plumbing Details

Description: Revised heating and plumbing details for the city hall building in Abilene, Texas. It includes a diagram of the boiler and converter connections, and a plot plan showing where the building is in relation to the surrounding buildings and streets. There is a large plumbing riser diagram drawn at the bottom of the sheet and a chart detailing the symbols used drawn on the right side of the sheet.
Date: December 15, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Hudson Residence, Pecos, Texas: Elevations

Description: Elevation plan for a home commissioned by Mr. and Mrs. Hill Hudson in Pecos, Texas. It includes drawings that detail the home's elevation from the North, South, East, and West sides of the building.
Date: December 20, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Hudson Residence, Pecos, Texas: Lawn Sprinkler System

Description: Layout of the lawn sprinkler system for a home commissioned by Mr. and Mrs. Hill Hudson in Pecos, Texas. It includes a large drawing of the lawn with grid-like lines dissecting the ground, which shows the pipes for the sprinklers. On the right side of the sheet there is a legend, and a set of notes that further explains the system.
Date: December 20, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Hudson Residence, Pecos, Texas: Air Conditioning Details

Description: Air conditioning plan for a home commissioned by Mr. and Mrs. Hill Hudson in Pecos, Texas. It includes a large layout of the home with notations concerning the air conditioning, such as the vents and fans. Also included is a list of the symbols used within the layout to detail the air conditioning.
Date: December 20, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Hudson Residence, Pecos, Texas: Roof Framing Plan

Description: Roof framing plan for a home commissioned by Mr. and Mrs. Hill Hudson in Pecos, Texas. It includes a drawing that looks at the roofing from an aerial point of view, with notations concerning the framework such as measurements, spacing, types of materials used, etc. The note in the top right corner details the ceiling joist framework around the fireplaces.
Date: December 20, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Abilene City Hall Alterations: Revised Plot Plan and Drawing Index

Description: Approved revised plot plan for the city hall building in Abilene, Texas. It includes a drawing of the layout of the building with respect to the surrounding streets and buildings, an index to the rest of the drawings in the set, a cross section looking North, the elevation of the existing North entrance, and a section of the North porch.
Date: December 15, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Abilene City Hall Alterations: Revised Second Floor Mechanical Plan

Description: Revised mechanical plan for the second floor of the city hall building in Abilene, Texas. It includes a large drawing of the floor plan for the second floor with labels showing where each room is and notations regarding the heating, plumbing, ventilation, and air conditioning systems throughout the floor.
Date: December 15, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Abilene City Hall Alterations: Elevation and Framework

Description: Original plan for the men's and women's bathrooms and door frames of the city hall building in Abilene, Texas. The drawings show details concerning the West elevation, partitions, men's and women's bathrooms, the door frames and counter.
Date: December 1, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Abilene City Hall Alterations: Revised Basement Electrical Plan

Description: Revised electrical plan for the basement of the city hall building in Abilene, Texas. It includes a large drawing of the floor plan of the basement with labels showing where each room is located and notations detailing the connections and wiring for the electrical work.
Date: December 15, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Abilene City Hall Alterations: Revised Second Floor Electrical Plan

Description: Revised electrical plan for the second floor of the city hall building in Abilene, Texas. It includes a large layout of the second floor with labels showing where each room and staircase is located; the lines on the drawing show the connections and wiring for the electrical work throughout the floor.
Date: December 15, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Hudson Residence, Pecos, Texas: Foundation Plans

Description: Foundation plan for a home commissioned by Mr. and Mrs. Hill Hudson in Pecos, Texas. It includes a large drawing of the layout of the home with notations concerning its foundation elements.
Date: December 20, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First Baptist Church, Big Lake, Texas: Supplemental Stone Details

Description: Detail plan for the First Baptist Church in Big Lake, Texas. It includes diagrams of sections "A-A" and detail B, elevation of east windows, side and front elevations, elevation at main entrance, detail of buttress caps, elevation of coping, and section thru coping.
Date: December 23, 1950
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Third Story Roof Framing Plan

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a drawing that shows the roof framing plan on the third level of the building; also included is a roof beam schedule and a diagram for the typical roof beam steel placement.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Footing Plan and Schedule

Description: Architectural plan for a high school building in the Reagan County Independent School District. It includes a drawing of the building's pier and footing plan as well as two construction schedules with general notes. The drawings on the left side of the sheet show details for the column, pier and footing.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School: Revised Electrical Plot Plan

Description: Revised mechanical plan for a high school building in the Reagan County Independent School District. It includes a supplemental drawing representing a revision to the original electrical plan for all of the buildings.
Date: December 2, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Framing Details

Description: Architectural drawings for a high school building in the Reagan County Independent School District. It includes multiple drawings detail various sections of the floor framework for the auditorium, as well as part of a staircase.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School: Supplemental Drawing

Description: Supplemental architectural plan for a high school building in the Reagan County Independent School District. It includes a partial plan drawn showing a set of trusses with an open space in the middle.
Date: December 28, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Second Story Framing Plan

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a large drawing of the roof framing plan for the second story, as well as smaller drawings that detail individual sections of the framework. There is a roof beam schedule and a column schedule drawn at the top of the sheet.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Floor Framing Plan

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a large drawing of the auditorium's first floor framing plan, and diagrams showing sections of the structural aspects of the framework. On the right of the sheet there is a grade beam schedule that details specifications and measurements for materials to be used.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Lester Residence Addition, Eldorado, Texas: Plans and Sections

Description: Architectural plan for additions to a home commissioned by Bill Lester in Eldorado, Texas. It includes the existing floor plan as well as the revised floor plan. There is also a plot plan, diagrams of various sections, and notes.
Date: December 30, 1957
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Roof Framing

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a drawing for the roof framing of the fourth level of the building; the smaller drawings on the left side of the sheet show details of for the framing broken down into individual sections. At the top of the sheet there are drawings for the roof trusses as well as a beam schedule.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Alta Vista Cafeteria, Abilene, Texas: Window, Door, Wall, & Elevation Details

Description: Window, door, wall, and elevation details for a cafeteria at Alta Vista Elementary School in Abilene, Texas. Sections include west elevation, south elevation, north elevation, east elevation, detail at wall parallel to steel joists, section thru stage front, typical wall section, section thru stage stairs, elevation for stage stairs, swing gate frame detail, elevation of removable pipe handrail at stage, typical window details, metal louver detail, typical exterior door frame details, typical i… more
Date: December 18, 1951
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen