49 Matching Results

Search Results

[Letter from Major T. N. Carswell to Major R. H. Hansford - April 29, 1941]

Description: A letter written to Major Major R.H. Hansford, 15th Battalion, Texas Defense Guard, Ranger, Texas, from T. N. Carswell, Major, 10th Battalion, Texas Defense Guard dated April 29, 1941. Carswell expresses his appreciation for the compliment to him by Hanford requesting that Carswell ask for the appointment for the inspection of his units.
Date: April 29, 1941
Creator: Carswell, T. N. (Thomas Norwood)
Partner: Hardin-Simmons University Library

Junior High School Building, Eastland, Texas: First and Second Story Layouts

Description: Architectural plan for a junior high school building in Eastland, Texas. It includes drawings that show the floor plan for both the first and second story of the building; each room, corridor, and door is labeled accordingly. Also included is a drawing that details the roofing plan for the building, as well as two work schedules that describe the materials to be used in construction.
Date: April 25, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Junior High School Building, Eastland, Texas: Building Elevations and Sections

Description: Architectural plan for a junior high school building in Eastland, Texas. It includes a drawing that shows part of the elevation for the front of the building; the drawing to the right shows a section of the building. The drawing on the far right of the sheet shows a "typical wall section" in the building, with measurements and specifications.
Date: April 25, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Junior High School Building, Eastland, Texas: First Story Plans

Description: Architectural plan for a junior high school building in Eastland, Texas. It includes multiple drawings concerning various details about the building's first floor; the two larger drawings on the left of the sheet show a footing plan and a framing plan for the floor. On the right there are smaller drawings concerning entrance details and a "first floor beam schedule" detailing the materials to be used in construction.
Date: April 25, 1929
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen