39 Matching Results

Search Results

Garage And Paint Shop, Coleman, Texas: Framing & Floor Details

Description: Framing and floor details for a garage and paint shop building commissioned by Shore Brothers in Coleman, Texas. Sections include second floor framing plan, roof framing plan, footing schedule, details of wash rack catch-basin, details of perforated G.I. cover, foundation & footing plan, detail of lintel beam, general notes, detail of second floor lintels, detail of ends of all roof beams, detail of construction at roof, detail of construction at second floor, and detail of steel column framing. more
Date: August 28, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Store And Office Building, Brechenridge, Texas: Foundation & Floor Plans

Description: Foundation and floor plans for a store and office building commissioned by A. O. Highers in Brechenridge, Texas. It includes a foundation plan, and second floor & mezzanine floor framing plan. They have measurements, notes, and wall boundary lines. Other small sections are included separately.
Date: August 1, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Store And Office Building, Brechenridge, Texas: Alternate Steel Joist Framing Plan For Second Floor

Description: Joist framing plan for a store and office building commissioned by A. O. Highers in Brechenridge, Texas. It includes measurements and other sections named detail front stairs, detail rear stair, typical section through joists, and section through beams.
Date: August 1, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Farmers and Merchants Bank, Abilene, Texas: Marble Newel Details

Description: Elevation renderings for a bank building for the Farmers and Merchants Bank in Abilene, Texas. Sections include 1 1/2" elevation, 1 1/2" plan of marble newel "A-A" stair B, 1 1/2" section plan of marble newel B-B stair A, and detail of low railing at office near stairway B.
Date: August 28, 1937
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Prairie Oil and Gas Company Office Building, Eastland, Texas: First Floor Framing Plan

Description: First floor framing plan for an office building commissioned by the Prairie Oil and Gas Company in Eastland, Texas. It features framing lines, column placement, wall edge lines, and measurements. Other sections include detail of beam "C", detail showing beam A-1, section thru wall beams at basement openings, section X-X thru temporary slab in elevator shaft, beam schedule for 1st floor, notes, and design data.
Date: August 6, 1919
Creator: Castle, David S.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Laundry Building, Abilene, Texas: Structural Steel Details

Description: Structural steel details for a laundry building commissioned by the Abilene Laundry Company in Abilene, Texas. Sections include detail of truss bearing on masonry walls, detail of middle joint TIR & TIL, detail of end joint TIR & TIL, detail of bracing, detail of interior columns, T3L as shown and T4R similar but opposite hand, and T1L & T2L similar except as noted but opposite hand.
Date: August 15, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Store And Office Building, Brechenridge, Texas: Window Details

Description: Window details for a store and office building commissioned by A. O. Highers in Brechenridge, Texas. They include sash window detail, 5" detail showing transom awning bar & show windows, details of interior trim, elevation of 2" office partitions, detail of pivoted sash between offices & reception rooms, details of office partitions, and mould renderings.
Date: August 1, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Garage And Paint Shop, Coleman, Texas: Elevation Renderings

Description: Elevation renderings for a garage and paint shop building commissioned by Shore Brothers in Coleman, Texas. Sections include left side elevation, right side elevation, front elevation, detail elevation-brick panels, elevation of office wall, top of private office partition, and 3" details of interior door & windows.
Date: August 28, 1928
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen