56 Matching Results

Search Results

Funeral Home, Merrel, Texas: Roof & Foundation Plans

Description: Roof and foundation plans for a funeral building commissioned by A. B. Barrow & A. T. Sheppard in Merrel, Texas. They include measurements, wall boundary lines, and labels. Other sections include a stirrup schedule, stair detail, pier & footing sizes chart, and section thru treads & risers.
Date: October 19, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Funeral Home, Merkel, Texas: First & Second Floor Plans

Description: First and second floor plans for a funeral home commissioned by A.B. Barrow and A.T. Sheppard in Merkel, Texas. They feature wall edge lines, measurements, labels, notes, electrical symbols, plumbing symbols, and a floor diagram. Located at 201 Edwards Street, Merkel, TX 79536.
Date: October 19, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

West Texas Utilities Office Addition, Abilene, Texas: Floor Plans

Description: Floor plans for an addition to the West Texas Utilities Company office building in Abilene, Texas. Sections include first floor plan, mezzanine floor plan, second floor plan, basement plan, and typical section thru suspended ceiling in elevator lobby. The floor plans feature wall edge lines, measurements, and labels.
Date: 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

West Texas Utilities Office Addition, Abilene, Texas: Typical Floor Plan

Description: Typical floor plan for an addition to the West Texas Utilities Company office building in Abilene, Texas. It includes wall edge lines with gray shading in between, room names, labels, and measurements. Other sections include a pent house plan, air conditioning room on 4th floor, plumbing risers, diagram of feeder system (electrical), wiring symbols, and plumbing symbols.
Date: June 15, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

West Texas Utilities Office Addition, Abilene, Texas: Typical Floor Structural Plan

Description: Typical floor structural plan for an addition to the West Texas Utilities Company office building in Abilene, Texas. It includes column placement, wall edge lines, measurements, and labels. Other sections include typical beam details, rod bending types, typical floor beam schedule, typical column details, and column schedule.
Date: June 15, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Funeral Home, Merrel, Texas: Sash, Wall, & Door Renderings

Description: Sash, wall, and door renderings for a funeral building commissioned by A. B. Barrow & A. T. Sheppard in Merrel, Texas. Sections are titled sill casement detail, door jamb typical door frame detail, section "A-A", 1/2 elevation of front entrance, 1/2" plan of front entrance, 1/2 plan of casement 2nd floor, 1/2 size interior door frame detail, 1/2 size typical steel sash detail, section thru CL, section "B-B", typical section thru stud wall, and detail of rail in chapel.
Date: September 19, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Grocery Building, Eastland, Texas: Elevation Renderings

Description: Elevation renderings for a grocery building commissioned by Pipkin's Grocery Co in Eastland, Texas. Sections include typical wall details, cross section x-x, typical glass block detail, typical steel sash detail, typical glass block detail, typical exterior door frame detail, 1/2 elevation, 1/2 plan showing beams, and 1/2 plan detail of door.
Date: July 18, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Pipkin's Grocery Co, Eastland, Texas: Floor Plan

Description: Floor plan for a grocery building commissioned by Pipkin's Grocery Co in Eastland, Texas. It includes room names, measurements, wall boundary lines, and labels. Other sections have a full size cove detail, steel sash schedule, door schedule, typical 1/2 size door frame detail, 1/2 size base, and finish schedule.
Date: July 18, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Funeral Home, Merrel, Texas: First & Second Floor Plans

Description: First and second floor plans for a funeral building commissioned by A. B. Barrow & A. T. Sheppard in Merrel, Texas. They include measurements, wall boundary lines, room names, and labels. Other sections include base trim, 1/2 size wainscot cap, full size picture mould, full size stop, full size ceiling mould, steel sash schedule, and door schedule.
Date: October 19, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

West Texas Utilities Office Addition, Abilene, Texas: Roof Structural Plan

Description: Roof structural plan for an addition to the West Texas Utilities Company office building in Abilene, Texas. It includes framing boundary lines, wall edge lines, notes, and measurements. Other sections include a 1/2 elevation of spandrel seams R-9 & R-10, reinforced concrete beams, floor beam schedule, spandrel beam schedule, and transition of columns.
Date: June 15, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

West Texas Utilities Office Addition, Abilene, Texas: Floor Plans

Description: Floor plans for an addition to the West Texas Utilities Company office building in Abilene, Texas. Sections include mezzanine floor plan, 2nd floor plan, 3rd floor plan, 1st floor plan, steel details, typical detail of steel column, typical anchor, and detail of columns supporting 2nd floor slab from above.
Date: June 15, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

West Texas Utilities Office Addition, Abilene, Texas: Stair Renderings

Description: Stair renderings for an addition to the West Texas Utilities Company office building in Abilene, Texas. Sections include section thru stair looking east, typical section K-K, typical underwriters d.h. windows detail in stair well, detail of stair at 2nd & 3rd floors, section thru rail, typical stair detail, full size cap detail, and 1/2 size hand rail detail.
Date: June 15, 1940
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen