303 Matching Results

Search Results

Army Mobilization Buildings: Plumbing Floor Plans

Description: Plumbing floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5-200 Men, floor plan type L-6 - 250 Men, floor plan type L-3 - 100 Men, floor plan type L-1 - 25 Men, floor plan type L-2 - 50 Men, floor plan type L-4 - 150 Men, capacities of water heaters and hot water storage tanks chart, and legend & notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Sections

Description: Miscellaneous sections for mobilization buildings in support of war efforts. They include d.h. window, detail of fixed window guard, detail of hinged window guard exterior, detail of hinged window guard interior, horizontally sliding window, exterior door detail, sliding door, interior door detail, sidewall section at water table, detail of shelf and mirror, typical details for insulation in exterior walls & first floor construction, concrete door sill, concrete pier & footing, porch door, deta… more
Date: August 6, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing

Description: Side elevation drawings for mobilization buildings in support of war efforts. They include typical end wall framing & part elevation, typical cross section showing partitions, typical side wall framing, and small sections for roof framing details.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Details

Description: Miscellaneous details for mobilization buildings in support of war efforts. They include d.h. window, detail of fixed window guard, detail of hinged window guard exterior, detail of hinged window guard interior, horizontally sliding window, exterior door detail, sliding door, interior door detail, sidewall section at water table, detail of shelf and mirror, concrete door sill, concrete pier for footing, porch door, details for recessed radiation, detail of wall framing and fire protection at he… more
Date: July 6, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Sections

Description: Miscellaneous details for mobilization buildings in support of war efforts. They include details of skirting, detail of scuttle in ceiling, wardrobe, bulletin board, details of louvers, detail of bench, detail of screened ceiling vent, detail of coal box, details of shelf, roof framing plan at chimney, platform and ladder detail, revisions, and graphic scales.
Date: May 3, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Sections

Description: Miscellaneous sections for mobilization buildings in support of war efforts. They include d.h. window, detail of fixed window guard, detail of hinged window guard exterior, detail of hinged window guard interior, horizontally sliding window, exterior door detail, sliding door, interior door detail, sidewall section at water table, detail of shelf and mirror, typical details for insulation in exterior walls & first floor construction, concrete door sill, concrete pier & footing, porch door, deta… more
Date: August 6, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing

Description: Side elevation drawings for mobilization buildings in support of war efforts. They include typical end wall framing & part elevation, typical cross section showing partitions, typical side wall framing, and small sections for roof framing details.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Details

Description: Miscellaneous sections for mobilization buildings in support of war efforts. They include d.h. window, detail of fixed window guard, detail of hinged window guard exterior, detail of hinged window guard interior, horizontally sliding window, exterior door detail, sliding door, interior door detail, sidewall section at water table, detail of shelf and mirror, typical details for insulation in exterior walls & first floor construction, concrete door sill, concrete pier & footing, porch door, deta… more
Date: August 6, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Wall Framing & Cross Sections

Description: Wall framing and cross sections for mobilization buildings in support of war efforts. They include typical cross section, typical end wall framing and part elevation, typical side wall framing for all types, typical end wall framing and part elevation, and small detailed mechanical sections.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Plumbing Floor Plans

Description: Plumbing floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5-200 Men, floor plan type L-6 - 250 Men, floor plan type L-3 - 100 Men, floor plan type L-1 - 25 Men, floor plan type L-2 - 50 Men, floor plan type L-4 - 150 Men, capacities of water heaters and hot water storage tanks chart, and legend & notes.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Sections

Description: Miscellaneous sections for mobilization buildings in support of war efforts. They include d.h. window, detail of fixed window guard, detail of hinged window guard exterior, detail of hinged window guard interior, horizontally sliding window, exterior door detail, sliding door, interior door detail, sidewall section at water table, detail of shelf and mirror, typical details for insulation in exterior walls & first floor construction, concrete door sill, concrete pier & footing, porch door, deta… more
Date: August 6, 1940
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Floor Plans

Description: Floor plans for mobilization buildings in support of war efforts. They include floor plan type L-5 (200 Men), floor plan type L-6 (250 Men), typical elevations, floor plan type L-3 (100 Men), floor plan type L-1 (25 Men), floor plan type L-2 (50 Men), floor plan type L-4 (150 Men), heater room end elevation, toilet room end elevation, notes, gas fired heating cabinets chart, electric fixture schedule, and elevation detail.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Duct Shaft Details

Description: Duct shaft details for mobilization buildings in support of war efforts. They include detail thru duct shaft that is vertical to wall, detail thru duct shaft that is parallel to wall, plan above roof detail of smoke pipe for one story building, and other mechanical sections.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Pipes & Vents

Description: Standard heating details for mobilization buildings in support of war efforts. Sections include details of main ducts and outlets where deflection pans or plaques are used, detail of wire mesh grilled, notes, optional duct arrangements straight line duct system, details of main ducts and branches where grilles are used, details of smoke pipes and vent hoods for ranges, detail of smoke pipe manifold, typical schematic arrangement of heater room equipment.
Date: 19uu
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Standard Toilet Room Details

Description: Standard toilet room details for mobilization buildings in support of war efforts. Sections include plan of shower stall, section of partition showing lavatory & urinal, elevation of lavatories shelf & mirrors, section of partition showing service sink, screen at water closet, detail of shower room, plan of toilet room stall, details of bathtub stalls. Details of urinal trough.
Date: 19uu
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Electrical Details

Description: Electrical details for mobilization buildings in support of war efforts. They include explosion proof fixtures, waterproof fixture, reflected plan, typical service diagram, weatherproof fixture with mounting for concealed work and mounting for exposed work, and a legend.
Date: May 5, 1937
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen