58 Matching Results

Search Results

Paxton Building, Abilene, Texas: Elevation Drawings

Description: Building elevation renderings for a remodel of Paxton building commissioned by Sweetbriar Shops Inc. in Abilene, Texas. They include measurements, labels, and notes. Sections are called north 2nd Street elevation, Cypress Street elevation, detail of new steel columns & beams, show window panels, Cypress Street interior elevation, south "B" elevation, north "A" elevation, and reflected plan of beam showing plates supporting concrete lintel.
Date: May 18, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Midwest Electric Cooperative Office, Roby, Texas: First Floor Plan

Description: First floor plan for an office building commissioned by Midwest Electric Cooperative, Inc. in Roby, Texas. It features wall edge lines, room names, measurements, electrical code, door schedule, projected window detail, full size base and casing, and sliding gate detail.
Date: May 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Midwest Electric Cooperative Office, Roby, Texas: Wall Renderings

Description: Wall elevation renderings for an office building commissioned by Midwest Electric Cooperative, Inc. in Roby, Texas. Sections include section X-X, section Y-Y, detail of toilet & shower stall, section thru tread & riser, head section "M", counter detail, section thru stair, section Z-Z, and rail detail to bookkeeper.
Date: May 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Details

Description: Miscellaneous details for mobilization buildings in support of war efforts. They include section thru landing & steps, section thru heater room & wood floor, section thru interior heater room wall at toilet room, section thru interior stud partition between concrete & wood floor, section thru exterior wall at toilet wash or shower room, typical details of concrete slab on wood floor in areas other than toilet & shower rooms, section thru interior partition occurring between joist, details of ty… more
Date: May 3, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Midwest Electric Cooperative Office, Roby, Texas: North & East Elevations

Description: North and east elevation renderings for an office building commissioned by Midwest Electric Cooperative, Inc. in Roby, Texas. They feature wall edge lines, measurements, column base boundary lines, windows, and labels. Other sections include construction joint detail, 3" scale typical weakened plane joint, typical corner detail, and typical section thru garage doors.
Date: May 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Standard Details

Description: Standard details for mobilization buildings in support of war efforts. They include typical detail of asbestos cement flue pipe with maximum 10" diameter, plan above roof, section thru flue pipe at 2nd floor, detail of smoke pipe for one story building, detail of clean out door, typical detail of asbestos cement flue pipe for 12'-36' diameters inclusive, and detail of flue pipe support.
Date: May 12, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Midwest Electric Cooperative Office, Roby, Texas: Second Floor Plan

Description: Second floor plan for an office building commissioned by Midwest Electric Cooperative, Inc. in Roby, Texas. It features wall edge lines, room names, labels, and measurements. Other sections include roof plan over directors room, and revised wood window details.
Date: May 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First National Bank, Baird, Texas: Roof Plan

Description: Roof plan for a bank building commissioned by the First National Bank in Baird, Texas. It includes measurements, wall boundary lines, and labels. Other sections include a floor plan of present building, and 1/2 elevation of truss "A" & truss "B" similar.
Date: July 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Midwest Electric Cooperative Office, Roby, Texas: Foundation Plan

Description: Foundation plan for an office building commissioned by Midwest Electric Cooperative, Inc. in Roby, Texas. It features wall edge lines, column placement, measurements, and labels. Other sections include section thru vault, detail of retaining wall, section thru steps to storage platform, detail of wall beams at door openings, and typical concrete wall showing piers & footings.
Date: May 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Miscellaneous Details

Description: Miscellaneous details for mobilization buildings in support of war efforts. They include details of skirting, detail of scuttle in ceiling, wardrobe elevation, bulletin board elevation, details of louvers, detail of bench, detail of screened ceiling vent, detail of coal box, details of shelf, roof framing plan at chimney, platform and ladder detail, and graphic scales.
Date: May 3, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First National Bank, Baird, Texas: Floor Plan

Description: Floor plan for a bank building commissioned by the First National Bank in Baird, Texas. It includes measurements, room names, wall boundary lines, and labels. Other sections include interior door frame detail, entrance detail, steel sash schedule, door schedule, and finish schedule.
Date: July 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Locker & Cheese Plant, Merkel, Texas: Foundation Plan

Description: Foundation plan for a locker & cheese plant building commissioned by Merkel Coop Association in Merkel, Texas. It has measurements, labels, wall boundary lines, and section names. Other sections include rod bending types, index to drawings, a beam schedule, and pier & footing schedule.
Date: February 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Midwest Electric Cooperative Office, Roby, Texas: Door & Window Details

Description: Door and window details for an office building commissioned by Midwest Electric Cooperative, Inc. in Roby, Texas. Sections include a finish schedule, window schedule, typical sash "D" detail, typical d.h. window detail, detail of sliding garage door, and plate glass sticking detail.
Date: April 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Daxton Building, Abilene, Texas: Window & Entrance Plan With Elevation Drawing

Description: Elevation drawing and plan for a remodel of Daxton building commissioned by Sweetbriar Shops Inc. in Abilene, Texas. They include measurements, labels, and wall boundary lines. Sections are called front show window & entrance plan, interior elevation, exterior elevation, corner elevation, thru door head, and section thru vestibule.
Date: June 18, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Locker & Cheese Plant, Merkel, Texas: Flat Top Roof Truss Detail

Description: Flat top roof truss detail for a locker & cheese plant building commissioned by Merkel Coop Association in Merkel, Texas. It has beam line boundaries, measurements, and labels. Other sections have detail "A", detail "B", footing sections, bottom chord plan, and top chord plan.
Date: February 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

First National Bank, Baird, Texas: 1/4" Plan Showing Concrete Slab Over Record Vault

Description: Concrete slab plan for a bank building commissioned by First National Bank in Baird, Texas. It includes measurements, room names, wall boundary lines, and notes. Sections include 3/4" plan showing steel in place, 1/4" plan showing concrete slab over record vault, 1/4" section 6-7, and 1/2" section 14.
Date: October 25, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Midwest Electric Cooperative Office, Roby, Texas: West & South Elevations

Description: West and south elevation renderings for an office building commissioned by Midwest Electric Cooperative, Inc. in Roby, Texas. They feature wall edge lines, measurements, column base boundary lines, windows, and labels. Other sections include detail of splash block, and downspout head detail.
Date: May 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Standard Electrical Details

Description: Standard electrical details for mobilization buildings in support of war efforts. They include drop cord fixture, glass enclosing globe fixture, porcelain socket, explosion proof fixture, vapor proof fixture, extended bracket, symmetrical angle reflector, flush fixture, dome reflector, typical service diagram, weatherproof fixture, glass steel diffuser, legend, and notes.
Date: May 12, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Midwest Electric Cooperative Office, Roby, Texas: Wall, Door, & Entrance Details

Description: Wall, door, and entrance details for an office building commissioned by Midwest Electric Cooperative, Inc. in Roby, Texas. Sections include 1/2 entrance elevation, section thru door, typical section G-G, part elevation of display front, typical wall elevation, entrance detail, and jamb head similar typical exterior door frame detail.
Date: May 1, 1941
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen