8 Matching Results

Search Results

Big Lake High School Auditorium: Floor Framing Plan

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a large drawing of the auditorium's first floor framing plan, and diagrams showing sections of the structural aspects of the framework. On the right of the sheet there is a grade beam schedule that details specifications and measurements for materials to be used.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Footing Plan and Schedule

Description: Architectural plan for a high school building in the Reagan County Independent School District. It includes a drawing of the building's pier and footing plan as well as two construction schedules with general notes. The drawings on the left side of the sheet show details for the column, pier and footing.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Roof Framing

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a drawing for the roof framing of the fourth level of the building; the smaller drawings on the left side of the sheet show details of for the framing broken down into individual sections. At the top of the sheet there are drawings for the roof trusses as well as a beam schedule.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Second Story Framing Plan

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a large drawing of the roof framing plan for the second story, as well as smaller drawings that detail individual sections of the framework. There is a roof beam schedule and a column schedule drawn at the top of the sheet.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Big Lake High School Auditorium: Third Story Roof Framing Plan

Description: Architectural plan for an auditorium at a high school building in the Reagan County Independent School District. It includes a drawing that shows the roof framing plan on the third level of the building; also included is a roof beam schedule and a diagram for the typical roof beam steel placement.
Date: December 14, 1954
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen