74 Matching Results

Search Results

Army Mobilization Buildings: Standard Details

Description: Standard details for mobilization buildings in support of war efforts. They include typical detail of asbestos cement flue pipe with maximum 10" diameter, plan above roof, section thru flue pipe at 2nd floor, detail of smoke pipe for one story building, detail of clean out door, typical detail of asbestos cement flue pipe for 12'-36' diameters inclusive, and detail of flue pipe support.
Date: May 12, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Room Addition, Abilene, Texas: Floor & Roof Framing Plans

Description: Floor and roof framing plans for a store room addition commissioned by Ed Robinson Pharmacy in Abilene, Texas. They include measurements, labels, notes, and room boundary lines. Other sections include floor plan notes, door schedule, typical wall section A-A, typical footing detail, exterior door details, roof framing details, typical window details, foundation details, foundation plan, and general notes.
Date: November 12, 1959
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Plans For The Munday High School, Munday, Texas: Typical End Elevation & Door Details

Description: Typical end elevation and door details for a school building. Sections include typical end elevation, scale detail of typical double hung window frame, base for corridors, detail of louvers, blackboard & chalk rail, section picture molding, detail casing, floor base for all class rooms, tread & riser, detail of wainscot cap, and section stool & apron.
Date: July 12, 1921
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Robert Mancill Building, Cisco, Texas: Longitudinal Elevation & Cornice Detail

Description: Longitudinal elevation and cornice detail for a building commissioned by Mr. Robert Mancill in Cisco, Texas. The longitudinal elevation rendering has windows, doors, columns, measurements, and labels. The cornice detail has wall texture lines, orange coloring, measurements, and labels.
Date: August 12, 1918
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Standard Electrical Details

Description: Standard electrical details for mobilization buildings in support of war efforts. They include drop cord fixture, glass enclosing globe fixture, porcelain socket, explosion proof fixture, vapor proof fixture, extended bracket, symmetrical angle reflector, flush fixture, dome reflector, typical service diagram, weatherproof fixture, glass steel diffuser, legend, and notes.
Date: May 12, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Ice Plant, Abilene, Texas: Floor Plan

Description: Floor plan for an ice plant owned by the Independent Ice and Refrigerating Company in Abilene, Texas. It features wall edge lines, labels, measurements, and room names. Other sections include a window & door schedule, and hardware for side and rear doors.
Date: January 12, 1925
Creator: David S. Castle Co.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.

Army Mobilization Buildings: Standard Electrical Details

Description: Standard electrical details for mobilization buildings in support of war efforts. Sections include type "A" drop cord fixture, type "B" glass enclosing globe fixture, porcelain socket, type "EC" and "EB" explosion proof fixture, type "D" vapor-proof fixture, type "F" extended bracket, type "G" symmetrical angle reflector, type "H" flush fixture, type "R" dome reflector, typical service diagram, type "J" weatherproof fixture, type "M" glass steel diffuser, and symbol legend.
Date: May 12, 1941
Creator: United States. Office of the Quartermaster General. Construction Division.
Partner: Tittle-Luther/Parkhill, Smith and Cooper, Inc.
Back to Top of Screen