Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS Page: 162 of 264
This report is part of the collection entitled: Office of Scientific & Technical Information Technical Reports and was provided to The Portal to Texas History by the UNT Libraries Government Documents Department.
- Highlighting
- Highlighting On/Off
- Color:
- Adjust Image
- Rotate Left
- Rotate Right
- Brightness, Contrast, etc. (Experimental)
- Cropping Tool
- Download Sizes
- Preview all sizes/dimensions or...
- Download Thumbnail
- Download Small
- Download Medium
- Download Large
- High Resolution Files
- IIIF Image JSON
- IIIF Image URL
- Accessibility
- View Extracted Text
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
TABLE 3. 5.1.3-IV
KIPS ELECTRItAL HEATER CARTRIDGE THERMAL TEST PROGRAMElectrical Heater
KIPS1020001
Physical Tests
Electrical Tests RT
Bakeout 400 F, VacuumTest Fixture A
KIPS1020001
Burn-tn400*F/2000*F, Vacuum
Setup & Checks
Quantity (6)
Test A1 Steady State
- Argon
- 1800*F
- 1 Week (168 hrs)Test A2 Thermal Cycle
. Vacuum 1
- RT-1800*F - RT
- Dwell 5 minutes
- 30 Cycles
Test A3 Life
- Vacuum 1 h
- 1800*F
- > 10 Monthsw I
Test Fixture B
Burn-i400OF/2000*F, Vacuum
Setup & Checks
Quantity (6)
Test Bi Steady State
- Argon
- 1800 F
- 1 Week
Test B2 Steady State
- Vacuum
- 1800'F
-1 WeekTest Fixture C
Burn-in400*F/2000oF, Vacuum
Setup & Checks
Quantity (6)
Test C1 Steady State
- Vacuum
- 1800*F
- 1 Week
Test C2 Steady State
A Argon
- 1800*F
-1 Week
Test C3 Maximum-Power
-Vacuum
- 2700 W(e)
2 Days (48 hrs)a
Upcoming Pages
Here’s what’s next.
Search Inside
This report can be searched. Note: Results may vary based on the legibility of text within the document.
Matching Search Results
View 210 places within this report that match your search.Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Report.
Kilowatt Isotope Power System, Phase II Plan. Volume IV. Teledyne FSCD vs GDS, report, March 15, 1978; Timonium, Maryland. (https://texashistory.unt.edu/ark:/67531/metadc1055866/m1/162/?q=%22~1%22~1: accessed July 16, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; crediting UNT Libraries Government Documents Department.