The Greensheet (Dallas, Tex.), Vol. 36, No. 314, Ed. 1 Friday, February 8, 2013 Page: 3 of 68
This newspaper is part of the collection entitled: Texas Digital Newspaper Program and was provided to The Portal to Texas History by the UNT Libraries.
Extracted Text
The following text was automatically extracted from the image on this page using optical character recognition software:
February 8-14, 2013
Page 3
Nosotros tenemos el plan perfecto de electricidad de Texas solo para usted. Todos estan aprobados.
M®
><®[T57D©(S
iW@F^®[/D@0© /^[pOW®^
S
(SaDD ©m GBsi©©^
§>®0®® & ©®fw0@® ^©graB
"
sMora o a
Penstar Power
w?»wD[o)®[iii§S§iii'[3®w®o'o(g®[ii
-wm
Provisioned AMS meter required. Offers for Simply Smart Plan. Post Paid plans may require deposit. Rep #10087
Servicio el mismo dfa disponible para todos los planes. Metros AMS necesarios para todos, sin necesidad de deposito, sin verification de credito, planes sin cargos por pagos atrasados.
Business Advertising 214-853-6088 Classified Ads 1-800-687-6412
Visit us at thegreensheet.com
Dallas East Greensheet
Upcoming Pages
Here’s what’s next.
Search Inside
This issue can be searched. Note: Results may vary based on the legibility of text within the document.
Tools / Downloads
Get a copy of this page or view the extracted text.
Citing and Sharing
Basic information for referencing this web page. We also provide extended guidance on usage rights, references, copying or embedding.
Reference the current page of this Newspaper.
The Greensheet (Dallas, Tex.), Vol. 36, No. 314, Ed. 1 Friday, February 8, 2013, newspaper, February 8, 2013; Dallas, Texas. (https://texashistory.unt.edu/ark:/67531/metapth404002/m1/3/: accessed April 26, 2024), University of North Texas Libraries, The Portal to Texas History, https://texashistory.unt.edu; .